POSOCO_Final_Logo

Northern Regional Load Despatch Centre

POWER SYSTEM OPERATION CORPORATION LIMITED

(A Government of India Enterprise) CIN: U40105DL2009GOI188682

NRLDC GSTIN : 07AAFCP2086B1ZO

ISO-9001-2008ISO-14001-2004ISO-IEC-27001-2013OHSAS-18001-2007PAS-99-2012
Login | Intranet | Mail
  • Home
  • Transfer capability
    • Monthly ATC-Inter Country
    • Monthly ATC-Inter Regional
    • Monthly ATC-Intra Regional
    • Current IR Exchanges
      • Declared Capability
  • Scheduling
    • WBES
      • Web Based Scheduling before 30 May,2020
      • Scheduling Summary
      • Scheduling Details
      • Old Schedule
        • Declared Capability
        • Entitlements
        • State Drawal Schedules
        • ISGS Injection Schedules
        • Injection Profile
        • URS Details
          • Total Available URS
            • Station
            • State
          • URS Sold Under STOA
          • Current Available URS
            • Thermal Station
            • Gas Stations
          • Re-Scheduled URS
            • Station Wise
            • State Wise
        • Transmission Constraints
          • State Wise
          • Station Wise
        • IR Drawal Schedules
        • Implemented Schedules
          • Form-A
          • Form-B
          • Form-C
          • IR Drawal
          • URS
        • Summary
          • State Wise
          • Station Wise
        • Applicable Losses
    • Upgraded WBES
      • Upgraded WBES
      • Schedule Summary
      • Schedule Details
    • Applicable PoC Losses
    • Estimated Tx Loss
    • Peak Hours and Season Declaration
    • Solar Forecast
      • Solar Forecast Data
      • Solar Forecast Graph
    • Regional Wind Forecast
  • Open Access
    • New Web Based STOA
    • View Bilateral Transactions
      • Prior to Aug-2018
      • Aug-2018 onwards
    • View Refused Applications
      • Prior to Aug-2018
      • Aug 2018 onwards
    • Inter – Regional Links Usage
    • Transmission Losses for Last 52 Weeks In NR
    • STU/SLDC Report
    • Applicant Refund Report
    • CERC’s Orders
    • Open Access Related Document
    • Refund Reconciliation Sheet
    • STU/SLDC Reconciliation Sheet
  • Renewables
    • Modified Procedures for REC w.e.f. 06.07.2020
    • RE Framework Procedures
    • Formats for Registrations
  • Commercial
    • DSM Rates
    • NR Pool Account
      • Pool Account Reconciliation Portal
      • Reconciliation of Pool Accounts
      • Deviation/RE/Congestion Disb Letters
    • SEM Data
    • Guidelines for Computation
    • Time Correction Procedure Video
    • Time Correction Procedure
    • NRLDC Fee and Charges
      • NRLDC F& C Billing/Payment Software
      • NRLDC Fee and Charges Order
      • NRLDC User Details
      • Bank Detail For Remmitting NRLDC Fee and Charges
      • Bill Details
      • F and C Reconciliation
      • Truing-up Details
    • Violation Report
      • Zero Crossing Violation Report
      • Deviation Report
    • Discrepancy report
    • Metering Regulations
    • Handbook on interface Energy Metering System in NR
  • Availability Verification
  • Reports
    • Daily Reports
      • Daily Regional Power Supply Position
      • Outage Report
      • Fog Report
      • Generating Units Outage Status(before 25/09/2019)
      • Transmission Elements Outage Status (before 25/09/2019)
    • Weekly Reports
    • Quarterly Reports
    • Monthly Reports
    • Annual Reports
    • VDI
      • Daily
        • VDI 765kV
        • VDI 400kV
      • VDI Weekly
        • VDI 765KV(Weekly)
        • VDI 400KV(Weekly)
      • Monthly
        • VDI 765KV(Monthly)
        • VDI 400KV(Monthly)
    • Trend Graphs
      • Frequency Profile in NR
      • Shdl vs Act drawal of states in NR
    • RTU Availability
    • Telemetry Report
    • SCADA-SEM Comparision Report
    • System Reliability Indices(All India)
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Differences
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliabilty
    • Grid Disturbances / Incidences
    • FRC
    • Tripping Report
      • Preliminary Report
    • New Web Based Reporting
    • Tripping Monitoring System
  • Documents
  • Real-Time Data
    • RE Initiative
  • Weather
    • NR Weather Info
    • Thunderstorm Live Status
  • Other RLDCs
    • NLDC
    • ERLDC
    • SRLDC
    • WRLDC
    • NERLDC
  • Outage
    • Shutdown Planning

Documents

Title File Size File Date Download
NR Reactive Power Management 2021
23.49 MB 30 Dec, 2020 View / Download
Operating Procedure of Northern Region July 2020
45.56 MB 20 Jul, 2020 View / Download
Procedure for integration of Power System Elements

Procedure for integration of Power System Elements

36.42 MB 24 Jun, 2020 View / Download
NR Important Grid Elements May 2020

NR Important Grid Elements May 2020

4.03 MB 30 May, 2020 View / Download
System Restoration Procedure-2020
16.39 MB 05 Feb, 2020 View / Download
nr-reactive-power-management-2020/
19.59 MB 31 Dec, 2019 View / Download
Dynamic Data Modeling Templates
9.43 MB 11 Sep, 2019 View / Download
Enhancing real time situational awareness at during faults_CIGRE_Colloquium 2019
954.65 KB 19 Aug, 2019 View / Download
Procedure for Integration of New Elements into Grid
1.90 MB 08 Aug, 2019 View / Download
Operating Procedure of Northern Region-July 2019
22.81 MB 19 Jul, 2019 View / Download
NR Important grid elements May 2019
28.23 MB 31 May, 2019 View / Download
NR-Reactive Power Management-2019
18.10 MB 31 Dec, 2018 View / Download
Operating Procedures of Northern Region July 2018
21.49 MB 20 Jul, 2018 View / Download
Important Grid Element of Norther Region_May 2018
5.23 MB 01 Jun, 2018 View / Download
SPS Document of Northern Region
1.82 MB 12 Jan, 2018 View / Download
NR-Reactive Power Management-2018
24.79 MB 29 Dec, 2017 View / Download
Operating Procedure of Northern Region for 2017-18
17.85 MB 20 Jul, 2017 View / Download
Important Grid Elements Northern Region list-May17_Ver1
2.52 MB 17 May, 2017 View / Download
Challenges faced and solutions for Network modelling and implementation of State Estimator at NRLDC-PECCON 2017

Challenges faced and solutions for Network modelling and implementation of State Estimator at NRLDC-PECCON 2017

969.69 KB 10 Mar, 2017 View / Download
261_ApplicationofSynchrophasorforGridEventAnalysis_Porwal_Sharma_Pandey_Muthukumar_India
1.03 MB 06 Jan, 2017 View / Download
A Near Miss- 200911281326 (1)
676.84 KB 06 Jan, 2017 View / Download
An Indian Experience of defense Against Blackouts and Restoration Mechanism Followed
1.50 MB 06 Jan, 2017 View / Download
Application of Synchrophasors for Over Voltage Tripping Analysis
714.47 KB 06 Jan, 2017 View / Download
ApplicationofSynchrophasors_PrekshaDalawai&VivekPandey_NRLDC
484.07 KB 06 Jan, 2017 View / Download
Arbitrage
627.86 KB 06 Jan, 2017 View / Download
C2_109_2014
686.62 KB 06 Jan, 2017 View / Download
CIGRE 2016_SC3-302_Enhancing resilience of the North Indian Power System…
1.06 MB 06 Jan, 2017 View / Download
CIGRE2008_C2-107
260.74 KB 06 Jan, 2017 View / Download
Challenges_Final_As Submitted
1.13 MB 06 Jan, 2017 View / Download
EmpoweringIndiathroughIntegratedGridOperation-SRN
241.33 KB 06 Jan, 2017 View / Download
Experience_of_commissioning_of_PMUs_Pilot_Project_in_The_Northern_Region_of_India_NPSC_2010
479.62 KB 06 Jan, 2017 View / Download
FacilitatingOpen AccessWithoutCompromisingGridSecurity_SRN&VP
1.11 MB 06 Jan, 2017 View / Download
Final Paper – Advance Concept
1.29 MB 06 Jan, 2017 View / Download
HOW FOG MONITORING AND FORECSTING CAN HELP POWERSYSTEM
63.18 KB 06 Jan, 2017 View / Download
Mock Black start Exercise in NR
1.21 MB 06 Jan, 2017 View / Download
MockBlackstartExcellentLearningExperience_CBIP_Conference_5_PA
399.71 KB 06 Jan, 2017 View / Download
OperationalExperienceofSynchrophasorPilotProject_CBIP_Conference_5_PA
522.39 KB 06 Jan, 2017 View / Download
POWERCON_2016_paper_226
2.03 MB 06 Jan, 2017 View / Download
Power Exchange_Final_22_Jan_09
1.13 MB 06 Jan, 2017 View / Download
Reactive Power & Freq_relationship_CBIP
280.82 KB 06 Jan, 2017 View / Download
RelevanceofKnowledgeManagementinControlCentres
214.22 KB 06 Jan, 2017 View / Download
SCB5_315_PS3_Paper_ProtectionSystemPerformance
215.85 KB 06 Jan, 2017 View / Download
Significance_of_UI
167.19 KB 06 Jan, 2017 View / Download
Smart_Grid initiativeatSuperGridLevelInIndia_Hyderabad
622.12 KB 06 Jan, 2017 View / Download
Smart_Grid
610.45 KB 06 Jan, 2017 View / Download
TransparencyInPowerSystemOperation
133.25 KB 06 Jan, 2017 View / Download
VHPSO_FINAL
1.68 MB 06 Jan, 2017 View / Download
frc
336.52 KB 06 Jan, 2017 View / Download
A Tribute To Power Systems Guru – Charles Concordia
1,009.09 KB 06 Jan, 2017 View / Download
A story in quotes
0.00 KB 06 Jan, 2017 View / Download
ABC_ABT
496.18 KB 06 Jan, 2017 View / Download
Book_review_PACW Spring09
201.77 KB 06 Jan, 2017 View / Download
Efficient Data Management
1.25 MB 06 Jan, 2017 View / Download
GridMgmtOverview_Nov2007_ElectricalIndia
497.79 KB 06 Jan, 2017 View / Download
Indian_Blackout
351.81 KB 06 Jan, 2017 View / Download
PoetryUI
222.39 KB 06 Jan, 2017 View / Download
Renewable_Energy_-_P.K.Agarwal
1.53 MB 06 Jan, 2017 View / Download
SCADAinIndianPowerSystem_PKA
2.62 MB 06 Jan, 2017 View / Download
UI_Mechanism_SKS
146.56 KB 06 Jan, 2017 View / Download
Book Review
201.77 KB 17 Sep, 2016 View / Download
Smart Grid initiative at Super Grid level in India_ IE conference 15-16 July 2009_Hyderabad
610.45 KB 17 Sep, 2016 View / Download
  • Linkedin
  • Twitter
  • About Us
  • Awards
  • Tenders
  • RTI
  • Site Map
  • Contact Us
  • Feedback
  • Disaster Management
  • Internship-Guide Lines
  • Useful Links
NRLDC, POWER SYSTEM OPERATION CORPORATION LIMITED,
18-A, Shaheed Jeet Singh Sansalwal Marg, Katwaria Sarai, New Delhi -110016 © Copyright ©2017 NRLDC
  • English
  • हिन्दी
All Visitors:  

WordPress Download Manager - Best Download Management Plugin

Disclaimer

Precautions have been taken by Northern RegionalLoad Dispatch Center (NRLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NRLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NRLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NRLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NRLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NRLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.