POSOCO_Final_Logo

Northern Regional Load Despatch Centre

POWER SYSTEM OPERATION CORPORATION LIMITED

(A Government of India Enterprise) CIN: U40105DL2009GOI188682

NRLDC GSTIN : 07AAFCP2086B1ZO

ISO-9001-2008ISO-14001-2004ISO-IEC-27001-2013OHSAS-18001-2007PAS-99-2012
Login | Intranet | Mail
  • Home
  • Transfer capability
    • Monthly ATC-Inter Country
    • Monthly ATC-Inter Regional
    • Monthly ATC-Intra Regional
    • Current IR Exchanges
      • Declared Capability
  • Scheduling
    • WBES
      • Web Based Scheduling before 30 May,2020
      • Scheduling Summary
      • Scheduling Details
      • Old Schedule
        • Declared Capability
        • Entitlements
        • State Drawal Schedules
        • ISGS Injection Schedules
        • Injection Profile
        • URS Details
          • Total Available URS
            • Station
            • State
          • URS Sold Under STOA
          • Current Available URS
            • Thermal Station
            • Gas Stations
          • Re-Scheduled URS
            • Station Wise
            • State Wise
        • Transmission Constraints
          • State Wise
          • Station Wise
        • IR Drawal Schedules
        • Implemented Schedules
          • Form-A
          • Form-B
          • Form-C
          • IR Drawal
          • URS
        • Summary
          • State Wise
          • Station Wise
        • Applicable Losses
    • Upgraded WBES
      • Upgraded WBES
      • Schedule Summary
      • Schedule Details
    • Applicable PoC Losses
    • Estimated Tx Loss
    • Peak Hours and Season Declaration
    • Solar Forecast
      • Solar Forecast Data
      • Solar Forecast Graph
    • Regional Wind Forecast
  • Open Access
    • New Web Based STOA
    • View Bilateral Transactions
      • Prior to Aug-2018
      • Aug-2018 onwards
    • View Refused Applications
      • Prior to Aug-2018
      • Aug 2018 onwards
    • Inter – Regional Links Usage
    • Transmission Losses for Last 52 Weeks In NR
    • STU/SLDC Report
    • Applicant Refund Report
    • CERC’s Orders
    • Open Access Related Document
    • Refund Reconciliation Sheet
    • STU/SLDC Reconciliation Sheet
  • Renewables
    • Modified Procedures for REC w.e.f. 06.07.2020
    • RE Framework Procedures
    • Formats for Registrations
  • Commercial
    • DSM Rates
    • NR Pool Account
      • Pool Account Reconciliation Portal
      • Reconciliation of Pool Accounts
      • Deviation/RE/Congestion Disb Letters
    • SEM Data
    • Guidelines for Computation
    • Time Correction Procedure Video
    • Time Correction Procedure
    • NRLDC Fee and Charges
      • NRLDC F& C Billing/Payment Software
      • NRLDC Fee and Charges Order
      • NRLDC User Details
      • Bank Detail For Remmitting NRLDC Fee and Charges
      • Bill Details
      • F and C Reconciliation
      • Truing-up Details
    • Violation Report
      • Zero Crossing Violation Report
      • Deviation Report
    • Discrepancy report
    • Metering Regulations
    • Handbook on interface Energy Metering System in NR
  • Availability Verification
  • Reports
    • Daily Reports
      • Daily Regional Power Supply Position
      • Outage Report
      • Fog Report
      • Generating Units Outage Status(before 25/09/2019)
      • Transmission Elements Outage Status (before 25/09/2019)
    • Weekly Reports
    • Quarterly Reports
    • Monthly Reports
    • Annual Reports
    • VDI
      • Daily
        • VDI 765kV
        • VDI 400kV
      • VDI Weekly
        • VDI 765KV(Weekly)
        • VDI 400KV(Weekly)
      • Monthly
        • VDI 765KV(Monthly)
        • VDI 400KV(Monthly)
    • Trend Graphs
      • Frequency Profile in NR
      • Shdl vs Act drawal of states in NR
    • RTU Availability
    • Telemetry Report
    • SCADA-SEM Comparision Report
    • System Reliability Indices(All India)
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Differences
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliabilty
    • Grid Disturbances / Incidences
    • FRC
    • Tripping Report
      • Preliminary Report
    • New Web Based Reporting
    • Tripping Monitoring System
  • Documents
  • Real-Time Data
    • RE Initiative
  • Weather
    • NR Weather Info
    • Thunderstorm Live Status
  • Other RLDCs
    • NLDC
    • ERLDC
    • SRLDC
    • WRLDC
    • NERLDC
  • Outage
    • Shutdown Planning

Guidelines for Computation

SEM Hand book

  1. Special Energy Meters (SEM) in NR:
    1. Details of SEMs installed in NR are available at
      Master File . MASTER file contains following SEM details.

      1. Meter ID
      2. CT Ratio
      3. PT Ratio
      4. Type of Meter
      5. Location of Meter
  2.  

  3. Use Notepad to open raw Data, Processed and Entity wise SEM data files.
  4.  

  5. Raw SEM data:
    1. As per IEGC 6.4.21 Encrypted SEM data from all concerned stations is sent to NRLDC every week by Tuesday for data validation and energy accounting.
    2. Encrypted SEM data is decoded at NRLDC using software’s provided by SEM vendors.
    3. Decoded SEM data at NRLDC end is used for Energy accounting and is available in text files.
    4. Decoded SEM data of all meters in NR is available at https://nrldc.in/commercial/sem-data/current-week/raw-data/
    5. Raw SEM data is uploaded in website every week by Friday after completion of energy accounting.
  6.  

  7. Processed Data:
    1. Wh Raw SEM data is computed for actual values (in MWh) by applying multiplication factor.     Multiplication Factor(M.F)= (CT Ratio x PT Ratio)/1000000
    2. Inputs for M.F is available Master File
    3. Weekly processed SEM data is uploaded in website every week by Friday
    4. Processed SEM data is available at Processed Sem Data.
    5. Each .rar file contains seven folders in the format of DDMMYY.
    6. Each folder contains processed SEM data of all meters for a particular day.
    7. Format of file name pertaining to a SEM meter is NPXXXXA.MWH/GJXXXXA. XXXX is four digit meter id.
    8. Each processed data file (NPXXXXA.MWH) contains data in 16 rows, each row contains data of 4 blocks(i.e 00:00 hrs to 24:00 hrs)
  8.  

  9. Entity wise SEM data:
    1. Entity wise Injection/Drawal data is available at Net Injection of ISGS & BBMB & Net Drawal of States
    2. Each entity wise file contains
      1. Master frequency data(In 2 digit Frequency code format) Actual frequency = 49.5 + (Frq Code/100)
      2. SEM data of lines from which Injection/Drawal is computed
      3. Total Injection/Drawal of an entity
    3. Philosophy of Injection/Drawal Computation:
      1. The sign convention of power flow recorded by meters is positive for power flow out of bus-bar and negative for power flow into the bus-bar.
      2. Net injection/drawal at any location is algebraic sum of meters (including sign) on all feeders/ICTs/GTs listed with that location.
      3. Net drawal of State Utilities would be algebraic sum of drawals at all the locations listed for that utility.
  10.  

  11. Discrepancy Report:
    1. Details of Discrepancies observed in SEM data during energy accounting is available at Discrepancy Report
    2. Weekly discrepancy report is uploaded in website every week by Friday.
    3. Discrepancy report consists of following details:
      1. Details of meters replaced with standby/check meters due to non availability of SEM data at NRLDC.
      2. Details of meters replaced with standby/check meters due to discrepancy/under recording of main meter.
      3. Details of adjustments done in main meter data due to discrepancy in few blocks.
      4. Details of Time drift in SEMs.

 

  • Linkedin
  • Twitter
  • About Us
  • Awards
  • Tenders
  • RTI
  • Site Map
  • Contact Us
  • Feedback
  • Disaster Management
  • Internship-Guide Lines
  • Useful Links
NRLDC, POWER SYSTEM OPERATION CORPORATION LIMITED,
18-A, Shaheed Jeet Singh Sansalwal Marg, Katwaria Sarai, New Delhi -110016 © Copyright ©2017 NRLDC
  • English
  • हिन्दी
All Visitors:  

WordPress Download Manager - Best Download Management Plugin

Disclaimer

Precautions have been taken by Northern RegionalLoad Dispatch Center (NRLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NRLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NRLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NRLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NRLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NRLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.