POSOCO_Final_Logo

उत्तर क्षेत्रीय भार प्रेषण केन्द्र

पॉवर सिस्टम ऑपरेशन कार्पोरेशन लिमिटेड

(भारत सरकार का उद्यम) CIN: U40105DL2009GOI188682

एनआरएलडीसी GSTIN : 07AAFCP2086B1ZO

ISO-9001-2008ISO-14001-2004ISO-IEC-27001-2013OHSAS-18001-2007PAS-99-2012
लॉगिन | इंट्रानेट | मेल
  • Home
  • Transfer capability
    • Monthly ATC-Inter Country
    • Monthly ATC-Inter Regional
    • Monthly ATC-Intra Regional
    • Current IR Exchanges
      • Declared Capability
  • Scheduling
    • New WBES
      • Web Based Scheduling before 30 May,2020
      • Scheduling Summary
      • Scheduling Details
      • Old Schedule
        • Declared Capability
        • Entitlements
        • State Drawal Schedules
        • ISGS Injection Schedules
        • Injection Profile
        • URS Details
          • Total Available URS
            • Station
            • State
          • URS Sold Under STOA
          • Current Available URS
            • Thermal Station
            • Gas Stations
          • Re-Scheduled URS
            • Station Wise
            • State Wise
        • Transmission Constraints
          • State Wise
          • Station Wise
        • IR Drawal Schedules
        • Implemented Schedules
          • Form-A
          • Form-B
          • Form-C
          • IR Drawal
          • URS
        • Summary
          • State Wise
          • Station Wise
        • Applicable Losses
    • Upgraded WBES
      • Upgraded WBES
      • Schedule Summary
      • Schedule Details
    • Applicable PoC Losses
    • Estimated Tx Loss
    • Peak Hours Declaration
    • Solar Forecast
      • सौर पूर्वानुमान
    • Regional Wind Forecast
  • Open Access
    • New Web Based STOA
    • View Bilateral Transactions
      • Prior to Aug-2018
      • Aug-2018 onwards
    • View Refused Applications
      • Prior to Aug-2018
      • Aug 2018 onwards
    • Inter – Regional Links Usage
    • Transmission Losses for Last 52 Weeks In NR
    • STU/SLDC Report
    • Application Refund Report
    • CERC’s Orders
    • Open Access Related Document
  • Renewables
    • RE Framework Procedures
    • Formats for Registrations
  • Commercial
    • DSM Rates
    • NR Pool Account
      • Reconciliation of RE Deviation & Congestion
      • Deviation/RE/Congestion Disb Letters
    • SEM Data
    • Guidelines for Computation
    • Time Correction Procedure
    • NRLDC Fee and Charges
      • NRLDC F& C Billing/Payment Software
      • NRLDC Fee and Charges Order
      • NRLDC User Details
      • Bank Detail For Remmitting NRLDC Fee and Charges
      • Bill Details
      • F and C Reconciliation
      • Truing-up Details
    • Violation Report
      • Zero Crossing Violation Report
      • Deviation Report
    • Discrepancy report
    • Metering Regulations
    • Handbook on interface Energy Metering System in NR
  • Availability Verification
  • Reports
    • Daily Reports
      • Daily Regional Power Supply Position
      • Fog Report
      • Generating Units Outage Status
      • Transmission Elements Outage Status
    • Weekly Reports
    • Quarterly Reports
    • Monthly Reports
    • Annual Reports
    • VDI
      • Daily
        • VDI 765kV
        • VDI 400kV
      • VDI Weekly
        • VDI 765KV(Weekly)
        • VDI 400KV(Weekly)
      • Monthly
        • VDI 765KV(Monthly)
        • VDI 400KV(Monthly)
    • Trend Graphs
      • Frequency Profile in NR
      • Shdl vs Act drawal of states in NR
    • RTU Availability
    • Telemetry Report
    • SCADA-SEM Comparision Report
    • System Reliability Indices(All India)
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Differences
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliabilty
    • Grid Disturbances / Incidences
    • Tripping Report
      • Preliminary Report
    • New Web Based Reporting
    • Tripping Monitoring System
  • Documents
  • Real-Time Data
    • RE Initiative
  • Weather
    • NR Weather Info
    • Thunderstorm Live Status
  • Other RLDCs
    • NLDC
    • ERLDC
    • SRLDC
    • WRLDC
    • NERLDC
  • Outage
    • Shutdown Planning

Shdl vs Act drawal of states in NR

Not available

  • Linkedin
  • Twitter
  • हमारे बारे में
  • पुरस्कार
  • साइट मैप
  • हमसे संपर्क करें
  • प्रतिक्रिया
  • आपदा प्रबंधन
  • इंटर्नशिप-दिशानिर्देश
  • अन्य लिंक
उत्तर क्षेत्रीय भार प्रेषण केन्द्र, पॉवर सिस्टम ऑपरेशन कार्पोरेशन लिमिटेड 18-ए, शहीद जीत सिंह मार्ग, कटवारिया सराय, नई दिल्ली - 110016 © कॉपीराइट 2017 एन आर एल डी सी
  • English
  • हिन्दी
All Visitors:  

WordPress Download Manager - Best Download Management Plugin

Disclaimer

सावधानी पूर्वक डेटा / जानकारी अपलोड करने के लिए उत्तर क्षेत्रीय लोड डिस्पैच सेंटर (एनइआरयलडीसी) द्वारा उठाए गए हैं और अपलोड डेटा / सूचना सटीक, विश्वसनीय और पूर्ण माना जा रहा है। हालांकि, सूचना सामग्री पर भरोसा करने से पहले, उपयोगकर्ताओं को अपने उद्देश्यों के लिए अपनी सटीकता, मुद्रा, पूर्णता और प्रासंगिकता को सुनिश्चित करने के लिए सलाह दी जाती है, और, इस संबंध में, एनइआरयलडीसी किसी भी त्रुटि या चूक के लिए जिम्मेदार नहीं होगा। सभी जानकारी को किसी भी प्रकार की वारंटी के बिना प्रदान की जाती है।

एनइआरयलडीसी सभी व्यक्त, निहित, उपयोगकर्ता और / या किसी तीसरे पक्ष को किसी भी प्रकार की वैधानिक वारंटी, सटीकता, समयबद्धता, पूर्णता, बिक्री, या फिटनेस किसी विशेष प्रयोजन के रूप में वारंटी सहित अस्वीकार करता है। एनइआरयलडीसी का टोट, अनुबंध, या अन्यथा उपयोगकर्ता और / या तीसरे पक्ष के लिए कोई दायित्व नहीं है। इसके अलावां, एनइआरयलडीसी, किसी भी परिस्थिति में, उपयोगकर्ता के लिए, और / या किसी तीसरे पक्ष, के लिए खोया हुआ लाभ या खोया हुआ अवसर, अप्रत्यक्ष ,विशेष, परिणामी, आकस्मिक, या दंडात्मक क्षति जो भी है, भले ही एनइआरयलडीसी की सलाह दी गई है इस तरह के नुकसान के लिए जिम्मेदार नहीं होगा ।

इस साइट पर जाकर, उपयोगकर्ता इसका खंडन और संबद्ध शर्तों को अन्यत्र भेजने के लिए अपनी जागरूकता और समझौते के बारे में पुष्टि करते हैं।