Select Month Select Year For 26-Apr-2018 For 27-Apr-2018

STOA Scheduling Acceptance for April 2018

    Colored transactions are Revised/Surrendered
 
S.No Acceptance No Application no Utilities FromDate ToDate Schedule Route
1Apr-18/AP-47136-SD
26-Apr-18
NHPPL/APR/27
dt26-Apr-18
NHPPL
NHPPL
-TPDDL
27-Apr-18 27-Apr-18 0000-0400: 4.57 MW
0400-0800: 4.12 MW
0800-1200: 3.97 MW
1200-1500: 4.2 MW
1500-1800: 4.72 MW
1800-2400: 5.02 MW
----
2Apr-18/AP-47135-SD
26-Apr-18
SHEPL/APR/27
dt26-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
27-Apr-18 27-Apr-18 0000-0100: 4.11 MW
0100-0200: 4.03 MW
0200-0300: 3.64 MW
0300-0400: 3.4 MW
0400-0500: 3.25 MW
0500-0600: 3.01 MW
0600-0700: 2.93 MW
0700-0900: 2.7 MW
0900-1100: 2.46 MW
1100-1200: 2.54 MW
1200-1300: 2.78 MW
1300-1400: 2.7 MW
1400-1500: 3.64 MW
1500-1600: 3.95 MW
1600-1800: 4.74 MW
1800-2000: 5.2 MW
2000-2200: 5.28 MW
2200-2300: 4.97 MW
2300-2400: 4.89 MW
----
3Apr-18/AP-47134-SD
26-Apr-18
GBHPL/UPCL/270418
dt26-Apr-18
BUDHIL
BUDHIL
-UPCL
27-Apr-18 27-Apr-18 0000-0100: 59.8 MW
0100-0530: 29.9 MW
0830-2000: 29.9 MW
2000-2100: 59.8 MW
----
4Apr-18/AP-47133-DA
26-Apr-18
MPL/18-19/STOA/81
dt26-Apr-18
Manikaran
KPCPL
-UPCL
27-Apr-18 27-Apr-18 0000-0100: 15.18 MW
0100-0200: 14.69 MW
0200-0300: 15.02 MW
0300-0400: 13.95 MW
0400-0500: 12.2 MW
0500-0600: 11.26 MW
0600-0700: 12.73 MW
0700-0800: 13.71 MW
0800-0900: 12.13 MW
0900-1000: 10.26 MW
1000-1100: 9.39 MW
1100-1200: 10.19 MW
1200-1300: 12.87 MW
1300-1400: 14.48 MW
1400-1500: 14.46 MW
1500-1600: 16.32 MW
1600-1700: 18.12 MW
1700-1800: 20.71 MW
1800-1900: 19.85 MW
1900-2000: 17.97 MW
2000-2100: 17.44 MW
2100-2200: 16.93 MW
2200-2400: 14.93 MW
----
5Apr-18/AP-47132-DA
26-Apr-18
SPT/OA/4671-DA
dt26-Apr-18
SCLTPS
SCLTPS
-NPCL(UP)
27-Apr-18 27-Apr-18 0000-0100: 51 MW
0100-0300: 65 MW
0300-0400: 59 MW
0400-0500: 50 MW
0500-0700: 45 MW
0700-0800: 4 MW
0800-0900: 16 MW
0900-1000: 24 MW
1000-1100: 50 MW
1100-1200: 60 MW
1200-1300: 55 MW
1300-1400: 47 MW
1400-1500: 39 MW
1500-1700: 59 MW
1700-1800: 38 MW
1800-1900: 30 MW
1900-2200: 67 MW
2200-2300: 66 MW
2300-2400: 57 MW
----
6Apr-18/AP-47131-SD
25-Apr-18
SHEPL/APR/26-1
dt25-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
26-Apr-18 26-Apr-18 0000-0400: .66 MW
0400-0500: .51 MW
0500-0600: .27 MW
0600-0700: 2.97 MW
0700-0900: 2.74 MW
0900-1100: 2.5 MW
1100-1200: 2.58 MW
1200-1300: 2.82 MW
1300-1400: 2.74 MW
1400-1500: 3.68 MW
1500-1530: 3.99 MW
1530-1600: 1.21 MW
1600-1800: .47 MW
1800-2000: .16 MW
2000-2200: .23 MW
2200-2400: .66 MW
----
7Apr-18/AP-47124-SD
25-Apr-18
SPT/OA/4670-DA
dt25-Apr-18
SCLTPS
SCLTPS
-NPCL(UP)
26-Apr-18 26-Apr-18 0000-0100: 56 MW
0100-0200: 50 MW
0200-0300: 45 MW
0300-0400: 48 MW
0400-0500: 43 MW
0500-0600: 38 MW
0600-0700: 32 MW
0800-0900: 25 MW
0900-1000: 21 MW
1000-1100: 48 MW
1100-1200: 45 MW
1200-1300: 40 MW
1300-1400: 24 MW
1400-1500: 29 MW
1500-1600: 56 MW
1600-1700: 48 MW
1700-1800: 38 MW
1800-1900: 27 MW
1900-2300: 56 MW
2300-2400: 30 MW
----
8Apr-18/AP-47123-SD
25-Apr-18
SHEPL/APR/26
dt25-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
26-Apr-18 26-Apr-18 0000-0100: 3.48 MW
0100-0200: 3.32 MW
0200-0300: 3.01 MW
0300-0600: 2.78 MW
1530-1600: 2.78 MW
1600-1800: 4.3 MW
1800-2200: 5.08 MW
2200-2400: 4.34 MW
----
9Apr-18/AP-47122-SD
25-Apr-18
MPL/18-19/STOA/79
dt25-Apr-18
Manikaran
KPCPL
-UPCL
26-Apr-18 26-Apr-18 0000-0100: 17.14 MW
0100-0200: 16.65 MW
0200-0300: 16.12 MW
0300-0400: 15.11 MW
0400-0500: 13.71 MW
0500-0600: 12.73 MW
0600-0700: 14.46 MW
0700-0800: 14.55 MW
0800-0900: 12.31 MW
0900-1100: 10.28 MW
1100-1200: 11.17 MW
1200-1300: 13.41 MW
1300-1400: 14.48 MW
1400-1500: 14.46 MW
1500-1600: 16.79 MW
1600-1700: 20.08 MW
1700-1800: 21.16 MW
1800-2100: 21.26 MW
2100-2200: 20.77 MW
2200-2300: 18.66 MW
2300-2400: 18.19 MW
----
10Apr-18/AP-47121-DA
25-Apr-18
GBHPL/UPCL/260418-2
dt25-Apr-18
BUDHIL
BUDHIL
-UPCL
26-Apr-18 26-Apr-18 0100-0530: 29.9 MW
0830-2000: 29.9 MW
----
11Apr-18/AP-47127-DA
25-Apr-18
MPPL/957/12792
dt25-Apr-18
MITTAL
Mizoram
-NPCL(UP)
26-Apr-18 26-Apr-18 0000-0300: 10 MW
0300-1900: 0 MW
1900-2400: 10 MW
NER-ER-NR
12Apr-18/AP-47120-DA
25-Apr-18
NHPPL/APR/26
dt25-Apr-18
NHPPL
NHPPL
-TPDDL
26-Apr-18 26-Apr-18 0000-0400: 4.05 MW
0400-0800: 3.52 MW
0800-1200: 3.45 MW
1200-1400: 3.67 MW
1400-1800: 4.27 MW
1800-2400: 4.57 MW
----
13Apr-18/AP-47126-DA
25-Apr-18
MPPL/930/12784
dt25-Apr-18
MITTAL
Mizoram
-SIPL
26-Apr-18 26-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
14Apr-18/AP-47130-DA
25-Apr-18
26 Apr 18/SCF
dt25-Apr-18
ITCWIND
ITCWIND
-ITCLS
26-Apr-18 26-Apr-18 0000-2400: 1 MW SR-WR-NR
15Apr-18/AP-47125-DA
25-Apr-18
15/JITPL/NR-UP/18
dt25-Apr-18
JITPL
JITPL
-NRAILUP
26-Apr-18 26-Apr-18 0000-1100: 5.04 MW
1100-1500: 4.59 MW
1500-1900: 5.04 MW
1900-2200: 4.97 MW
2200-2300: 5.04 MW
2300-2400: 4.59 MW
ER-NR
16Apr-18/AP-47129-DA
25-Apr-18
HPPC-MP-260418
dt25-Apr-18
HPPC
MPPMCL
-HPPC
26-Apr-18 26-Apr-18 0000-2400: 150 MW WR-NR
17Apr-18/AP-47128-DA
25-Apr-18
BRPL/MP/0418-7
dt25-Apr-18
BRPL
MPPMCL
-BRPL
26-Apr-18 26-Apr-18 0000-2400: 75 MW WR-NR
18Apr-18/AP-47118-FS
25-Apr-18
GBHPL/UPCL/28-300418
dt24-Apr-18
BUDHIL
BUDHIL
-UPCL
28-Apr-18 30-Apr-18 0000-0100: 59.8 MW
2000-2100: 59.8 MW
----
19Apr-18/AP-47119-DA
24-Apr-18
GBHPL/UPCL/260418
dt24-Apr-18
BUDHIL
BUDHIL
-UPCL
26-Apr-18 26-Apr-18 0000-0100: 59.8 MW
2000-2100: 59.8 MW
----
20Apr-18/AP-47110-SD
24-Apr-18
SPT/OA/4669-DA
dt24-Apr-18
SCLTPS
SCLTPS
-NPCL(UP)
25-Apr-18 25-Apr-18 0000-0100: 65 MW
0100-0200: 59 MW
0200-0400: 48 MW
0400-0500: 43 MW
0500-0700: 38 MW
0900-1000: 16 MW
1000-1100: 43 MW
1100-1300: 50 MW
1300-1400: 29 MW
1400-1500: 40 MW
1500-1600: 64 MW
1600-1700: 53 MW
1700-1800: 43 MW
1800-1900: 32 MW
1900-2300: 65 MW
2300-2400: 30 MW
----
21Apr-18/AP-47109-SD
24-Apr-18
05-HPPC/April-18(DA)
dt24-Apr-18
HPSEB
HPPC
-HPSEB
25-Apr-18 25-Apr-18 0900-1600: 85 MW
1600-1700: 55 MW
----
22Apr-18/AP-47107-SD
24-Apr-18
MPL/18-19/STOA/78
dt24-Apr-18
Manikaran
KPCPL
-UPCL
25-Apr-18 25-Apr-18 0000-0100: 16.16 MW
0100-0200: 15.62 MW
0200-0300: 14.61 MW
0300-0400: 14.1 MW
0400-0500: 12.24 MW
0500-0600: 12.09 MW
0600-0700: 13.41 MW
0700-0800: 13.34 MW
0800-0900: 11.75 MW
0900-1000: 10.26 MW
1000-1100: 9.57 MW
1100-1200: 10.19 MW
1200-1300: 13.2 MW
1300-1400: 16.23 MW
1400-1500: 15.18 MW
1500-1600: 17.14 MW
1600-1700: 20.08 MW
1700-1900: 21.86 MW
1900-2000: 21.06 MW
2000-2200: 20.57 MW
2200-2300: 18.79 MW
2300-2400: 17.63 MW
----
23Apr-18/AP-47108-DA
24-Apr-18
NHPPL/APR/25
dt24-Apr-18
NHPPL
NHPPL
-TPDDL
25-Apr-18 25-Apr-18 0000-0400: 3.4 MW
0400-0800: 3.2 MW
0800-1400: 3.05 MW
1400-1800: 3.5 MW
1800-2400: 3.8 MW
----
24Apr-18/AP-47106-DA
24-Apr-18
SHEPL/APR/25
dt24-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
25-Apr-18 25-Apr-18 0000-0100: 2.85 MW
0100-0200: 2.7 MW
0200-0300: 2.62 MW
0300-0400: 2.46 MW
0400-0600: 2.21 MW
0600-0800: 1.95 MW
0800-0900: 1.8 MW
0900-1000: 1.95 MW
1000-1200: 1.72 MW
1200-1400: 1.8 MW
1400-1500: 1.95 MW
1500-1600: 2.74 MW
1600-1700: 3.4 MW
1700-2000: 3.91 MW
2000-2100: 3.64 MW
2100-2200: 3.25 MW
2200-2300: 3.05 MW
2300-2400: 2.97 MW
----
25Apr-18/AP-47117-DA
24-Apr-18
MPPL/956/B/12790
dt24-Apr-18
MITTAL
CSPDCL
-HPSEB
25-Apr-18 25-Apr-18 0000-0900: 0 MW
0900-1700: 100 MW
1700-2400: 0 MW
WR-NR
26Apr-18/AP-47116-DA
24-Apr-18
25 Apr 18/SCF
dt24-Apr-18
ITCWIND
ITCWIND
-ITCLS
25-Apr-18 25-Apr-18 0000-2400: 1 MW SR-WR-NR
27Apr-18/AP-47105-DA
24-Apr-18
HPPC-HP-250418
dt24-Apr-18
HPPC
HPSEB
-HPPC
25-Apr-18 25-Apr-18 1830-1900: 100 MW
1900-2100: 250 MW
2100-2200: 100 MW
----
28Apr-18/AP-47113-DA
24-Apr-18
14/JITPL/NR-UP/18
dt24-Apr-18
JITPL
JITPL
-NRAILUP
25-Apr-18 25-Apr-18 0000-1100: 5.04 MW
1100-1500: 4.59 MW
1500-1900: 5.04 MW
1900-2200: 4.97 MW
2200-2300: 5.04 MW
2300-2400: 4.59 MW
ER-NR
29Apr-18/AP-47115-DA
24-Apr-18
HPPC-MP-250418
dt24-Apr-18
HPPC
MPPMCL
-HPPC
25-Apr-18 25-Apr-18 0000-2400: 150 MW WR-NR
30Apr-18/AP-47112-DA
24-Apr-18
MPPL/930/12764
dt24-Apr-18
MITTAL
Mizoram
-SIPL
25-Apr-18 25-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
31Apr-18/AP-47111-DA
24-Apr-18
MPPL/12789
dt24-Apr-18
MITTAL
Mizoram
-NPCL(UP)
25-Apr-18 25-Apr-18 0000-1900: 0 MW
1900-2400: 10 MW
NER-ER-NR
32Apr-18/AP-47114-DA
24-Apr-18
BRPL/MP/0418-6
dt24-Apr-18
BRPL
MPPMCL
-BRPL
25-Apr-18 25-Apr-18 0000-2400: 75 MW WR-NR
33Apr-18/AP-47088-SD
23-Apr-18
SHEPL/APR/24-1
dt23-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
24-Apr-18 24-Apr-18 1000-1500: .16 MW
1500-1600: .4 MW
1600-1700: 1.02 MW
1700-2100: 1.33 MW
2100-2400: 1.25 MW
----
34Apr-18/AP-47082-DA
23-Apr-18
13/JITPL/NR-UP/18
dt23-Apr-18
JITPL
JITPL
-NRAILUP
24-Apr-18 24-Apr-18 0000-1100: 5.04 MW
1100-1500: 4.59 MW
1500-1900: 5.04 MW
1900-2200: 4.97 MW
2200-2300: 5.04 MW
2300-2400: 4.59 MW
ER-NR
35Apr-18/AP-47079-DA
23-Apr-18
MPL/18-19/STOA/77
dt23-Apr-18
Manikaran
KPCPL
-UPCL
24-Apr-18 24-Apr-18 0000-0100: 14.2 MW
0100-0200: 13.6 MW
0200-0300: 13.1 MW
0300-0400: 12.59 MW
0400-0500: 11.26 MW
0500-0600: 10.07 MW
0600-0700: 11.08 MW
0700-0800: 11.52 MW
0800-0900: 10.07 MW
0900-1000: 9.24 MW
1000-1100: 8.56 MW
1100-1200: 8.58 MW
1200-1300: 11.47 MW
1300-1400: 13.43 MW
1400-1500: 13.71 MW
1500-1600: 16.16 MW
1600-1700: 18.64 MW
1700-1900: 20.02 MW
1900-2000: 18.98 MW
2000-2100: 18.45 MW
2100-2200: 18.24 MW
2200-2300: 16.16 MW
2300-2400: 15.67 MW
----
36Apr-18/AP-47078-DA
23-Apr-18
NHPPL/APR/24
dt23-Apr-18
NHPPL
NHPPL
-TPDDL
24-Apr-18 24-Apr-18 0000-0600: 2.71 MW
0600-1200: 2.53 MW
1200-1600: 2.46 MW
1600-1900: 2.65 MW
1900-2400: 2.91 MW
----
37Apr-18/AP-47087-DA
23-Apr-18
24 Apr 18/SCF
dt23-Apr-18
ITCWIND
ITCWIND
-ITCLS
24-Apr-18 24-Apr-18 0000-2400: 1 MW SR-WR-NR
38Apr-18/AP-47077-DA
23-Apr-18
SPT/OA/4668-DA
dt23-Apr-18
SCLTPS
SCLTPS
-NPCL(UP)
24-Apr-18 24-Apr-18 0000-0100: 67 MW
0100-0200: 64 MW
0200-0400: 53 MW
0400-0500: 48 MW
0500-0700: 43 MW
0700-0800: 8 MW
0800-0900: 10 MW
0900-1000: 22 MW
1000-1100: 48 MW
1100-1200: 55 MW
1200-1300: 56 MW
1300-1400: 34 MW
1400-1500: 45 MW
1500-1600: 65 MW
1600-1700: 59 MW
1700-1800: 48 MW
1800-1900: 37 MW
1900-2200: 68 MW
2200-2300: 66 MW
2300-2400: 32 MW
----
39Apr-18/AP-47081-DA
23-Apr-18
MPPL/12781
dt23-Apr-18
MITTAL
Mizoram
-NPCL(UP)
24-Apr-18 24-Apr-18 0000-1900: 0 MW
1900-2400: 10 MW
NER-ER-NR
40Apr-18/AP-47086-DA
23-Apr-18
MPPL/929/R/12779
dt23-Apr-18
MITTAL
MPPMCL
-HPPC
24-Apr-18 24-Apr-18 0000-0200: 100 MW
0200-2200: 0 MW
2200-2400: 100 MW
WR-NR
41Apr-18/AP-47085-DA
23-Apr-18
HPPC-MP-240418
dt23-Apr-18
HPPC
MPPMCL
-HPPC
24-Apr-18 24-Apr-18 0000-2400: 150 MW WR-NR
42Apr-18/AP-47084-DA
23-Apr-18
BRPL/MP/0418-5
dt23-Apr-18
BRPL
MPPMCL
-BRPL
24-Apr-18 24-Apr-18 0000-2400: 75 MW WR-NR
43Apr-18/AP-47083-DA
23-Apr-18
MPPL/956/B/12780
dt23-Apr-18
MITTAL
CSPDCL
-HPSEB
24-Apr-18 24-Apr-18 0000-0900: 0 MW
0900-1700: 175 MW
1700-2400: 0 MW
WR-NR
44Apr-18/AP-47075-SD
23-Apr-18
MPL/18-19/STOA/76
dt23-Apr-18
Manikaran
KPCPL
-UPCL
23-Apr-18 23-Apr-18 1300-1400: 1.77 MW
1400-1500: 5.95 MW
1500-1600: 5.85 MW
1600-1700: 4.44 MW
1700-1900: 2.66 MW
1900-2000: 2.96 MW
2000-2100: 1.85 MW
2100-2200: 2.17 MW
2200-2300: 3.57 MW
2300-2400: 4.13 MW
----
45Apr-18/AP-47076-DA
23-Apr-18
SHEPL/APR/24
dt23-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
24-Apr-18 24-Apr-18 0000-0400: 1.88 MW
0400-0900: 1.56 MW
0900-1200: 1.45 MW
1200-1500: 1.56 MW
1500-1700: 2.11 MW
1700-2100: 2.35 MW
2100-2400: 2.27 MW
----
46Apr-18/AP-47080-DA
23-Apr-18
MPPL/930/12763
dt23-Apr-18
MITTAL
Mizoram
-SIPL
24-Apr-18 24-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
47Apr-18/AP-47069-SD
22-Apr-18
MPL/18-19/STOA/72
dt22-Apr-18
Manikaran
KPCPL
-UPCL
23-Apr-18 23-Apr-18 0000-0100: 9.79 MW
0100-0200: 9.57 MW
0200-0300: 9.37 MW
0300-0400: 9.65 MW
0400-0500: 8.82 MW
0500-0600: 8.56 MW
0600-0700: 9.91 MW
0700-0800: 9.7 MW
0800-0900: 8.96 MW
0900-1100: 7.56 MW
1100-1200: 9.65 MW
1200-1300: 10.33 MW
1300-1400: 11.75 MW
1400-1500: 12.24 MW
1500-1600: 14.2 MW
1600-1700: 15.62 MW
1700-1900: 17.39 MW
1900-2000: 16.16 MW
2000-2100: 16.34 MW
2100-2200: 15.56 MW
2200-2300: 13.22 MW
2300-2400: 11.26 MW
----
48Apr-18/AP-47071-SD
22-Apr-18
12/JITPL/NR-UP/18
dt22-Apr-18
JITPL
JITPL
-NRAILUP
23-Apr-18 23-Apr-18 0000-1100: 5.04 MW
1100-1500: 4.59 MW
1500-1900: 5.04 MW
1900-2200: 4.97 MW
2200-2300: 5.04 MW
2300-2400: 4.59 MW
ER-NR
49Apr-18/AP-47068-DA
22-Apr-18
SHEPL/APR/23
dt22-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
23-Apr-18 23-Apr-18 0000-0600: 1.49 MW
0600-1200: 1.34 MW
1200-1400: 1.42 MW
1400-1500: 1.49 MW
1500-1800: 1.65 MW
1800-2400: 1.88 MW
----
50Apr-18/AP-47067-DA
22-Apr-18
SPT/OA/4667-DA
dt22-Apr-18
SCLTPS
SCLTPS
-NPCL(UP)
23-Apr-18 23-Apr-18 0000-0100: 21 MW
0100-0200: 11 MW
0200-0300: 5 MW
0400-0500: 5 MW
0500-0600: 11 MW
0600-0700: 21 MW
0900-1000: 16 MW
1000-1100: 42 MW
1100-1200: 39 MW
1200-1300: 50 MW
1300-1400: 34 MW
1400-1500: 44 MW
1500-1700: 65 MW
1700-1800: 53 MW
1800-1900: 26 MW
1900-2300: 65 MW
2300-2400: 44 MW
----
51Apr-18/AP-47066-DA
22-Apr-18
NHPPL/APR/23
dt22-Apr-18
NHPPL
NHPPL
-TPDDL
23-Apr-18 23-Apr-18 0000-0600: 2.16 MW
0600-1200: 2.08 MW
1200-1600: 2.05 MW
1600-1900: 2.17 MW
1900-2400: 2.41 MW
----
52Apr-18/AP-47074-DA
22-Apr-18
23 Apr 18/SCF
dt22-Apr-18
ITCWIND
ITCWIND
-ITCLS
23-Apr-18 23-Apr-18 0000-2400: 1 MW SR-WR-NR
53Apr-18/AP-47073-DA
22-Apr-18
MPPL/956/B/12778
dt22-Apr-18
MITTAL
CSPDCL
-HPSEB
23-Apr-18 23-Apr-18 0000-0900: 0 MW
0900-1700: 175 MW
1700-2400: 0 MW
WR-NR
54Apr-18/AP-47070-DA
22-Apr-18
MPPL/930/12762
dt22-Apr-18
MITTAL
Mizoram
-SIPL
23-Apr-18 23-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
55Apr-18/AP-47044-SD
21-Apr-18
MPL/18-19/STOA/71
dt21-Apr-18
Manikaran
KPCPL
-UPCL
22-Apr-18 22-Apr-18 0000-0100: 1.1 MW
0100-0200: .95 MW
0200-0300: .69 MW
0300-0400: .49 MW
0400-0500: .7 MW
0500-0600: .56 MW
0600-0700: .47 MW
0700-0800: .93 MW
0900-1100: .56 MW
1100-1200: .42 MW
1300-1400: 1.78 MW
1400-1500: 4.39 MW
1500-1600: 5.79 MW
1600-1700: 5.51 MW
1700-1800: 2.29 MW
1800-1900: 3.08 MW
1900-2000: 3.34 MW
2000-2100: 2.15 MW
2100-2200: 2.21 MW
2200-2300: 2.94 MW
2300-2400: 2.96 MW
----
56Apr-18/AP-47043-SD
21-Apr-18
MPL/18-19/STOA/70
dt21-Apr-18
Manikaran
KPCPL
-UPCL
21-Apr-18 21-Apr-18 1900-2200: 2.34 MW
2200-2400: 1.87 MW
----
57Apr-18/AP-47045-SD
21-Apr-18
NHPPL/APR/22
dt21-Apr-18
NHPPL
NHPPL
-TPDDL
22-Apr-18 22-Apr-18 0000-0600: 2.09 MW
0600-1200: 2.01 MW
1200-1600: 1.98 MW
1600-1900: 2.1 MW
1900-2400: 2.19 MW
----
58Apr-18/AP-47046-SD
21-Apr-18
SHEPL/APR/22
dt21-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
22-Apr-18 22-Apr-18 0000-0400: 1.26 MW
0400-1200: 1.22 MW
1200-1500: 1.34 MW
1500-1800: 1.42 MW
1800-2400: 1.53 MW
----
59Apr-18/AP-47047-DA
21-Apr-18
MPL/18-19/STOA/68
dt21-Apr-18
Manikaran
KPCPL
-UPCL
22-Apr-18 22-Apr-18 0000-0100: 6.38 MW
0100-0200: 6.05 MW
0200-0300: 5.85 MW
0300-0400: 5.59 MW
0400-0500: 4.9 MW
0500-0600: 5.05 MW
0600-0700: 6.07 MW
0700-0800: 6.54 MW
0800-0900: 5.61 MW
0900-1100: 5.05 MW
1100-1200: 5.37 MW
1200-1300: 6.07 MW
1300-1400: 6.17 MW
1400-1500: 5.4 MW
1500-1600: 5.89 MW
1600-1700: 7.06 MW
1700-1800: 10.32 MW
1800-1900: 9.53 MW
1900-2000: 8.34 MW
2000-2100: 8.6 MW
2100-2200: 8.06 MW
2200-2300: 6.87 MW
2300-2400: 6.38 MW
----
60Apr-18/AP-47056-DA
21-Apr-18
11/JITPL/NR-UP/18
dt21-Apr-18
JITPL
JITPL
-NRAILUP
22-Apr-18 22-Apr-18 0000-2400: 7.41 MW ER-NR
61Apr-18/AP-47060-DA
21-Apr-18
MPPL/929/R/12776
dt21-Apr-18
MITTAL
MPPMCL
-HPPC
22-Apr-18 22-Apr-18 0000-0300: 100 MW
0300-2400: 0 MW
WR-NR
62Apr-18/AP-47059-DA
21-Apr-18
22 APR 18/SCF
dt21-Apr-18
ITCWIND
ITCWIND
-ITCLS
22-Apr-18 22-Apr-18 0000-2400: 1 MW SR-WR-NR
63Apr-18/AP-47048-DA
21-Apr-18
04-HPPC/April-18(DA)
dt21-Apr-18
HPSEB
HPPC
-HPSEB
22-Apr-18 22-Apr-18 0700-0900: 300 MW
0900-1600: 75 MW
1600-1700: 100 MW
----
64Apr-18/AP-47042-SD
21-Apr-18
MPL/18-19/STOA/69
dt21-Apr-18
Manikaran
KPCPL
-UPCL
21-Apr-18 21-Apr-18 1500-2100: 1.87 MW
2100-2400: 1.4 MW
----
65Apr-18/AP-47049-DA
21-Apr-18
HPPC-HP-220418
dt21-Apr-18
HPPC
HPSEB
-HPPC
22-Apr-18 22-Apr-18 1830-2030: 350 MW
2030-2100: 250 MW
2100-2200: 150 MW
2200-2300: 250 MW
----
66Apr-18/AP-47058-DA
21-Apr-18
MPPL/12777
dt21-Apr-18
MITTAL
CSPDCL
-HPSEB
22-Apr-18 22-Apr-18 0000-0900: 0 MW
0900-1700: 175 MW
1700-2400: 0 MW
WR-NR
67Apr-18/AP-47050-DA
21-Apr-18
SPT/OA/4666-DA
dt21-Apr-18
SCLTPS
SCLTPS
-NPCL(UP)
22-Apr-18 22-Apr-18 0000-0100: 69 MW
0100-0200: 58 MW
0200-0300: 48 MW
0300-0400: 37 MW
0400-0500: 26 MW
0500-0600: 16 MW
0600-0700: 37 MW
1900-2000: 21 MW
2000-2100: 32 MW
2100-2300: 37 MW
2300-2400: 32 MW
----
68Apr-18/AP-47055-DA
21-Apr-18
MPPL/930/12761
dt21-Apr-18
MITTAL
Mizoram
-SIPL
22-Apr-18 22-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
69Apr-18/AP-47065-DA
20-Apr-18
BMDRC/CPP/RE/05
dt20-Apr-18
SHPPBPL
SHPPBPL
-BMDRC
23-Apr-18 23-Apr-18 0000-2400: 1 MW ----
70Apr-18/AP-47064-DA
20-Apr-18
DDF/CPP/RE/05
dt20-Apr-18
SHPPBPL
SHPPBPL
-MAX-HPTL
23-Apr-18 23-Apr-18 0000-2400: .99 MW ----
71Apr-18/AP-47063-DA
20-Apr-18
GUJ/CPP/RE/05
dt20-Apr-18
SHPPBPL
SHPPBPL
-GMHRCMS
23-Apr-18 23-Apr-18 0000-2400: .6 MW ----
72Apr-18/AP-47062-DA
20-Apr-18
JHPL/CPP/RE/05
dt20-Apr-18
SHPPBPL
SHPPBPL
-JHPL
23-Apr-18 23-Apr-18 0000-2400: 1.04 MW ----
73Apr-18/AP-47061-DA
20-Apr-18
AHNL/CPP/RE/05
dt20-Apr-18
SHPPBPL
SHPPBPL
-ASIAN
23-Apr-18 23-Apr-18 0000-2400: 1.67 MW ----
74Apr-18/AP-47051-DA
20-Apr-18
GUJ/CPP/RE/04
dt20-Apr-18
SHPPBPL
SHPPBPL
-GMHRCMS
22-Apr-18 22-Apr-18 0000-2400: .6 MW ----
75Apr-18/AP-47052-DA
20-Apr-18
AHNL/CPP/RE/04
dt20-Apr-18
SHPPBPL
SHPPBPL
-ASIAN
22-Apr-18 22-Apr-18 0000-2400: 1.67 MW ----
76Apr-18/AP-47041-DA
20-Apr-18
BMDRC/CPP/RE/04
dt20-Apr-18
SHPPBPL
SHPPBPL
-BMDRC
22-Apr-18 22-Apr-18 0000-2400: 1 MW ----
77Apr-18/AP-47053-DA
20-Apr-18
DDF/CPP/RE/04
dt20-Apr-18
SHPPBPL
SHPPBPL
-MAX-HPTL
22-Apr-18 22-Apr-18 0000-2400: .99 MW ----
78Apr-18/AP-47054-DA
20-Apr-18
JHPL/CPP/RE/04
dt20-Apr-18
SHPPBPL
SHPPBPL
-JHPL
22-Apr-18 22-Apr-18 0000-2400: 1.04 MW ----
79Apr-18/AP-47072-DA
20-Apr-18
HPPC-MP-230418
dt20-Apr-18
HPPC
MPPMCL
-HPPC
23-Apr-18 23-Apr-18 0000-2400: 150 MW WR-NR
80Apr-18/AP-47057-DA
20-Apr-18
HPPC-MP-220418
dt20-Apr-18
HPPC
MPPMCL
-HPPC
22-Apr-18 22-Apr-18 0000-2400: 150 MW WR-NR
81Apr-18/AP-47024-SD
20-Apr-18
MPL/18-19/STOA/67
dt20-Apr-18
Manikaran
KPCPL
-UPCL
21-Apr-18 21-Apr-18 0000-0100: 4.9 MW
0100-0200: 5.05 MW
0200-0300: 4.84 MW
0300-0400: 5.16 MW
0400-0500: 4.51 MW
0500-0600: 4.64 MW
0600-0700: 5.47 MW
0700-0800: 5.89 MW
0800-0900: 5.05 MW
0900-1100: 4.54 MW
1100-1200: 4.83 MW
1200-1300: 5.47 MW
1300-1400: 5.61 MW
1400-1500: 5.4 MW
1500-1600: 5.89 MW
1600-1700: 6.56 MW
1700-1800: 7.89 MW
1800-1900: 7.29 MW
1900-2000: 5.89 MW
2000-2100: 6.45 MW
2100-2200: 5.91 MW
2200-2300: 5.4 MW
2300-2400: 4.9 MW
----
82Apr-18/AP-47025-SD
20-Apr-18
NHPPL/APR/21
dt20-Apr-18
NHPPL
NHPPL
-TPDDL
21-Apr-18 21-Apr-18 0000-0600: 1.92 MW
0600-1200: 1.85 MW
1200-1600: 1.82 MW
1600-1900: 2 MW
1900-2400: 2.15 MW
----
83Apr-18/AP-47038-DA
20-Apr-18
09/JITPL/NR-UP/18
dt20-Apr-18
JITPL
JITPL
-NRAILUP
21-Apr-18 21-Apr-18 0000-2400: 7.41 MW ER-NR
84Apr-18/AP-47026-DA
20-Apr-18
HPPC-HP-210418
dt20-Apr-18
HPPC
HPSEB
-HPPC
21-Apr-18 21-Apr-18 1830-1900: 75 MW
1900-2030: 300 MW
2030-2100: 225 MW
2100-2300: 100 MW
----
85Apr-18/AP-47040-DA
20-Apr-18
HPPC-MP-210418
dt20-Apr-18
HPPC
MPPMCL
-HPPC
21-Apr-18 21-Apr-18 0000-2400: 150 MW WR-NR
86Apr-18/AP-47027-DA
20-Apr-18
03-HPPC/April-18(DA)
dt20-Apr-18
HPSEB
HPPC
-HPSEB
21-Apr-18 21-Apr-18 0600-1400: 100 MW ----
87Apr-18/AP-47028-DA
20-Apr-18
MPPL/925/B/12774
dt20-Apr-18
MITTAL
HPPC
-HPSEB
21-Apr-18 21-Apr-18 0600-1800: 200 MW ----
88Apr-18/AP-47029-DA
20-Apr-18
SPT/OA/4665-DA
dt20-Apr-18
SCLTPS
SCLTPS
-NPCL(UP)
21-Apr-18 21-Apr-18 0000-0100: 67 MW
0100-0200: 63 MW
0200-0400: 53 MW
0400-0500: 48 MW
0500-0700: 42 MW
0700-0900: 5 MW
0900-1000: 21 MW
1000-1100: 53 MW
1100-1200: 60 MW
1200-1300: 55 MW
1300-1500: 44 MW
1500-1700: 63 MW
1700-1800: 48 MW
1800-1900: 37 MW
1900-2200: 68 MW
2200-2300: 65 MW
2300-2400: 44 MW
----
89Apr-18/AP-47039-DA
20-Apr-18
21 APR 18/SCF
dt20-Apr-18
ITCWIND
ITCWIND
-ITCLS
21-Apr-18 21-Apr-18 0000-2400: 1 MW SR-WR-NR
90Apr-18/AP-47030-DA
20-Apr-18
BMRDC/CPP/RE/03
dt20-Apr-18
SHPPBPL
SHPPBPL
-BMDRC
21-Apr-18 21-Apr-18 0000-2400: 1 MW ----
91Apr-18/AP-47031-DA
20-Apr-18
DDF/CPP/RE/03
dt20-Apr-18
SHPPBPL
SHPPBPL
-MAX-HPTL
21-Apr-18 21-Apr-18 0000-2400: .99 MW ----
92Apr-18/AP-47032-DA
20-Apr-18
GUJ/CPP/RE/03
dt20-Apr-18
SHPPBPL
SHPPBPL
-GMHRCMS
21-Apr-18 21-Apr-18 0000-2400: .6 MW ----
93Apr-18/AP-47033-DA
20-Apr-18
4834/OAN/GMRETL/HPSE
dt20-Apr-18
GMRETL
HPSEB
-DIAPL
21-Apr-18 21-Apr-18 0000-2400: 5.15 MW ----
94Apr-18/AP-47034-DA
20-Apr-18
JHPL/CPP/RE/03
dt20-Apr-18
SHPPBPL
SHPPBPL
-JHPL
21-Apr-18 21-Apr-18 0000-2400: 1.04 MW ----
95Apr-18/AP-47035-DA
20-Apr-18
AHNL/CPP/RE/03
dt20-Apr-18
SHPPBPL
SHPPBPL
-ASIAN
21-Apr-18 21-Apr-18 0000-2400: 1.67 MW ----
96Apr-18/AP-47023-FS
20-Apr-18
BMDRC/CPP/RE/01
dt19-Apr-18
SHPPBPL
SHPPBPL
-BMDRC
24-Apr-18 30-Apr-18 0000-2400: 1 MW ----
97Apr-18/AP-47022-FS
20-Apr-18
DDF/CPP/RE/01
dt19-Apr-18
SHPPBPL
SHPPBPL
-MAX-HPTL
24-Apr-18 30-Apr-18 0000-2400: .99 MW ----
98Apr-18/AP-47021-FS
20-Apr-18
GUJ/CPP/RE/01
dt19-Apr-18
SHPPBPL
SHPPBPL
-GMHRCMS
24-Apr-18 30-Apr-18 0000-2400: .6 MW ----
99Apr-18/AP-47020-FS
20-Apr-18
JHPL/CPP/RE/01
dt19-Apr-18
SHPPBPL
SHPPBPL
-JHPL
24-Apr-18 30-Apr-18 0000-2400: 1.04 MW ----
100Apr-18/AP-47019-FS
20-Apr-18
AHNL/CPP/RE/01
dt19-Apr-18
SHPPBPL
SHPPBPL
-ASIAN
24-Apr-18 30-Apr-18 0000-2400: 1.67 MW ----
101Apr-18/AP-47036-DA
20-Apr-18
SHEPL/APR/21
dt20-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
21-Apr-18 21-Apr-18 0000-0400: 1.06 MW
0400-1200: 1.1 MW
1200-1500: 1.17 MW
1500-1800: 1.21 MW
1800-2400: 1.25 MW
----
102Apr-18/AP-47037-DA
20-Apr-18
MPPL/930/12760
dt20-Apr-18
MITTAL
Mizoram
-SIPL
21-Apr-18 21-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
103Apr-18/AP-47012-SD
19-Apr-18
BMDRC/CPP/RE/02
dt19-Apr-18
SHPPBPL
SHPPBPL
-BMDRC
20-Apr-18 20-Apr-18 0000-2400: 1 MW ----
104Apr-18/AP-47011-SD
19-Apr-18
DDF/CPP/RE/02
dt19-Apr-18
SHPPBPL
SHPPBPL
-MAX-HPTL
20-Apr-18 20-Apr-18 0000-2400: .99 MW ----
105Apr-18/AP-47010-SD
19-Apr-18
GUJ/CPP/RE/02
dt19-Apr-18
SHPPBPL
SHPPBPL
-GMHRCMS
20-Apr-18 20-Apr-18 0000-2400: .6 MW ----
106Apr-18/AP-47009-SD
19-Apr-18
JHPL/CPP/RE/02
dt19-Apr-18
SHPPBPL
SHPPBPL
-JHPL
20-Apr-18 20-Apr-18 0000-2400: 1.04 MW ----
107Apr-18/AP-47008-SD
19-Apr-18
AHNL/CPP/RE/02
dt19-Apr-18
SHPPBPL
SHPPBPL
-ASIAN
20-Apr-18 20-Apr-18 0000-2400: 1.67 MW ----
108Apr-18/AP-46999-FS
19-Apr-18
APPCPL/147/4/3060
dt18-Apr-18
APPCPL
HPSEB
-LPCL
23-Apr-18 30-Apr-18 0000-2400: 1 MW ----
109Apr-18/AP-46998-FS
19-Apr-18
4835/OAN/GMRETL/HPSE
dt18-Apr-18
GMRETL
HPSEB
-DIAPL
22-Apr-18 22-Apr-18 0000-2400: 5.15 MW ----
23-Apr-18 30-Apr-18 0000-2400: 5.13 MW ----
110Apr-18/AP-47007-DA
19-Apr-18
MPL/18-19/STOA/65
dt19-Apr-18
Manikaran
KPCPL
-UPCL
20-Apr-18 20-Apr-18 0000-0300: 5.14 MW
0300-0400: 5.34 MW
0400-0500: 4.86 MW
0500-0600: 4.67 MW
0600-0700: 5.61 MW
0700-0800: 5.83 MW
0800-0900: 4.62 MW
0900-1200: 4.2 MW
1200-1300: 5.05 MW
1300-1500: 5.14 MW
1500-1600: 5.61 MW
1600-1700: 6.54 MW
1700-1800: 7.85 MW
1800-1900: 7.19 MW
1900-2000: 6.35 MW
2000-2100: 6.07 MW
2100-2400: 5.61 MW
----
111Apr-18/AP-47006-DA
19-Apr-18
NHPPL/APR/20
dt19-Apr-18
NHPPL
NHPPL
-TPDDL
20-Apr-18 20-Apr-18 0000-0600: 1.79 MW
0600-1200: 1.76 MW
1200-1600: 1.82 MW
1600-1900: 1.85 MW
1900-2400: 1.91 MW
----
112Apr-18/AP-47005-DA
19-Apr-18
SHEPL/APR/20
dt19-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
20-Apr-18 20-Apr-18 0000-0400: 1.11 MW
0400-1200: 1.15 MW
1200-1500: 1.19 MW
1500-1800: 1.27 MW
1800-2400: 1.46 MW
----
113Apr-18/AP-47016-DA
19-Apr-18
08/JITPL/NR-UP/18
dt19-Apr-18
JITPL
JITPL
-NRAILUP
20-Apr-18 20-Apr-18 0000-2400: 7.41 MW ER-NR
114Apr-18/AP-47018-DA
19-Apr-18
HPPC-MP-200418
dt19-Apr-18
HPPC
MPPMCL
-HPPC
20-Apr-18 20-Apr-18 0000-2400: 150 MW WR-NR
115Apr-18/AP-47004-DA
19-Apr-18
02-HPPC/April-18(DA)
dt19-Apr-18
HPSEB
HPPC
-HPSEB
20-Apr-18 20-Apr-18 0700-1200: 125 MW ----
116Apr-18/AP-47003-DA
19-Apr-18
MPPL/925/B/12770
dt19-Apr-18
MITTAL
HPPC
-HPSEB
20-Apr-18 20-Apr-18 0600-0700: 300 MW
0700-1200: 200 MW
1200-1800: 300 MW
----
117Apr-18/AP-47017-DA
19-Apr-18
20 APR 18/SCF
dt19-Apr-18
ITCWIND
ITCWIND
-ITCLS
20-Apr-18 20-Apr-18 0000-2400: 1 MW SR-WR-NR
118Apr-18/AP-47002-DA
19-Apr-18
SPT/OA/4664-DA
dt19-Apr-18
SCLTPS
SCLTPS
-NPCL(UP)
20-Apr-18 20-Apr-18 0000-0100: 65 MW
0100-0200: 63 MW
0200-0400: 53 MW
0400-0500: 48 MW
0500-0700: 42 MW
0700-0900: 5 MW
0900-1000: 21 MW
1000-1100: 53 MW
1100-1200: 60 MW
1200-1300: 55 MW
1300-1500: 44 MW
1500-1700: 55 MW
1700-1800: 48 MW
1800-1900: 37 MW
1900-2300: 65 MW
2300-2400: 44 MW
----
119Apr-18/AP-46997-SD
19-Apr-18
IEX_180419_00111
dt19-Apr-18
IEX
HPPC
-BYPL
19-Apr-18 19-Apr-18 1500-2200: 30 MW ----
120Apr-18/AP-47001-DA
19-Apr-18
HPPC-HP-200418
dt19-Apr-18
HPPC
HPSEB
-HPPC
20-Apr-18 20-Apr-18 1900-2130: 250 MW ----
121Apr-18/AP-47000-DA
19-Apr-18
4833/OAN/GMRETL/HPSE
dt19-Apr-18
GMRETL
HPSEB
-DIAPL
20-Apr-18 20-Apr-18 0000-2400: 5.15 MW ----
122Apr-18/AP-47015-DA
19-Apr-18
MPPL/930/12759
dt19-Apr-18
MITTAL
Mizoram
-SIPL
20-Apr-18 20-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
123Apr-18/AP-47014-DA
19-Apr-18
MPPL/12738
dt19-Apr-18
MITTAL
Mizoram
-DLFL
20-Apr-18 20-Apr-18 0000-1100: .7 MW
1100-2300: 1.9 MW
2300-2400: .7 MW
NER-ER-NR
124Apr-18/AP-47013-DA
19-Apr-18
MPPL/12746
dt19-Apr-18
MITTAL
Mizoram
-DLFPL
20-Apr-18 20-Apr-18 0000-1100: .4 MW
1100-2300: 1.5 MW
2300-2400: .4 MW
NER-ER-NR
125Apr-18/AP-46980-FS
18-Apr-18
GBHPL/UPCL/21-300418
dt17-Apr-18
BUDHIL
BUDHIL
-UPCL
21-Apr-18 30-Apr-18 0530-0600: 59.9 MW
2100-2400: 59.9 MW
----
126Apr-18/AP-46988-DA
18-Apr-18
SHEPL/APR/19
dt18-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
19-Apr-18 19-Apr-18 0000-0400: 1.1 MW
0400-1200: 1.14 MW
1200-1500: 1.17 MW
1500-1800: 1.25 MW
1800-2400: 1.45 MW
----
127Apr-18/AP-46992-DA
18-Apr-18
07/JITPL/NR-UP/18
dt18-Apr-18
JITPL
JITPL
-NRAILUP
19-Apr-18 19-Apr-18 0000-2400: 7.41 MW ER-NR
128Apr-18/AP-46987-DA
18-Apr-18
NHPPL/APR/19
dt18-Apr-18
NHPPL
NHPPL
-TPDDL
19-Apr-18 19-Apr-18 0000-0600: 1.91 MW
0600-1200: 1.83 MW
1200-1600: 1.82 MW
1600-1900: 1.98 MW
1900-2400: 2.06 MW
----
129Apr-18/AP-46996-DA
18-Apr-18
BRPL/MP/0418-3
dt18-Apr-18
BRPL
MPPMCL
-BRPL
19-Apr-18 19-Apr-18 0000-2400: 75 MW WR-NR
130Apr-18/AP-46986-DA
18-Apr-18
SPT/OA/4663-DA
dt18-Apr-18
SCLTPS
SCLTPS
-NPCL(UP)
19-Apr-18 19-Apr-18 0000-0100: 68 MW
0100-0200: 58 MW
0200-0300: 48 MW
0300-0400: 37 MW
0400-0500: 32 MW
0500-0600: 21 MW
0600-0700: 37 MW
0900-1000: 11 MW
1000-1100: 37 MW
1100-1300: 39 MW
1300-1500: 29 MW
1500-1700: 58 MW
1700-1800: 48 MW
1800-1900: 37 MW
1900-2300: 68 MW
2300-2400: 39 MW
----
131Apr-18/AP-46995-DA
18-Apr-18
19 Apr 18/SCF
dt18-Apr-18
ITCWIND
ITCWIND
-ITCLS
19-Apr-18 19-Apr-18 0000-2400: 1 MW SR-WR-NR
132Apr-18/AP-46985-DA
18-Apr-18
MPL/18-19/STOA/64
dt18-Apr-18
Manikaran
KPCPL
-UPCL
19-Apr-18 19-Apr-18 0000-0200: 5.14 MW
0200-0300: 5.83 MW
0300-0400: 4.86 MW
0400-0600: 4.67 MW
0600-0700: 5.38 MW
0700-0800: 5.61 MW
0800-0900: 5.05 MW
0900-1200: 4.2 MW
1200-1300: 5.05 MW
1300-1400: 4.67 MW
1400-1500: 5.14 MW
1500-1600: 5.61 MW
1600-1700: 6.54 MW
1700-1800: 7.85 MW
1800-1900: 6.54 MW
1900-2000: 6.35 MW
2000-2100: 6.07 MW
2100-2400: 5.61 MW
----
133Apr-18/AP-46984-DA
18-Apr-18
MPPL/925/B/12767
dt18-Apr-18
MITTAL
HPPC
-HPSEB
19-Apr-18 19-Apr-18 0800-1300: 200 MW
1300-1800: 300 MW
----
134Apr-18/AP-46979-SD
18-Apr-18
I18041812NR0001
dt18-Apr-18
PXIL
WBSEDCL
-JVVNL
18-Apr-18 18-Apr-18 0000-1500: 0 MW
1500-1800: 200 MW
1800-2400: 0 MW
ER-NR
135Apr-18/AP-46994-DA
18-Apr-18
MPPL/929/R/12768
dt18-Apr-18
MITTAL
MPPMCL
-HPPC
19-Apr-18 19-Apr-18 0000-0200: 100 MW
0200-2200: 0 MW
2200-2400: 100 MW
WR-NR
136Apr-18/AP-46983-DA
18-Apr-18
4832/OAN/GMRETL/HPSE
dt18-Apr-18
GMRETL
HPSEB
-DIAPL
19-Apr-18 19-Apr-18 0000-2400: 5.15 MW ----
137Apr-18/AP-46982-DA
18-Apr-18
01-HPPC/April-18(DA)
dt18-Apr-18
HPSEB
HPPC
-HPSEB
19-Apr-18 19-Apr-18 0800-1300: 150 MW ----
138Apr-18/AP-46981-DA
18-Apr-18
HPPC-HP-190418
dt18-Apr-18
HPPC
HPSEB
-HPPC
19-Apr-18 19-Apr-18 1900-2100: 300 MW
2100-2200: 150 MW
----
139Apr-18/AP-46991-DA
18-Apr-18
MPPL/12739
dt18-Apr-18
MITTAL
Mizoram
-DLFL
19-Apr-18 19-Apr-18 0000-1100: .7 MW
1100-2300: 1.9 MW
2300-2400: .7 MW
NER-ER-NR
140Apr-18/AP-46990-DA
18-Apr-18
MPPL/930/12758
dt18-Apr-18
MITTAL
Mizoram
-SIPL
19-Apr-18 19-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
141Apr-18/AP-46989-DA
18-Apr-18
MPPL/12745
dt18-Apr-18
MITTAL
Mizoram
-DLFPL
19-Apr-18 19-Apr-18 0000-1100: .4 MW
1100-2300: 1.5 MW
2300-2400: .4 MW
NER-ER-NR
142Apr-18/AP-46978-SD
17-Apr-18
4831/OAN/GMRETL/HPSE
dt17-Apr-18
GMRETL
HPSEB
-DIAPL
18-Apr-18 18-Apr-18 0000-2400: 5.15 MW ----
143Apr-18/AP-46977-SD
17-Apr-18
IEX_180417_00103
dt17-Apr-18
IEX
DBPL
-BRPL
17-Apr-18 17-Apr-18 0000-2200: 0 MW
2200-2300: 50 MW
2300-2400: 0 MW
WR-NR
144Apr-18/AP-46968-SD
17-Apr-18
MPL/18-19/STOA/56
dt17-Apr-18
Manikaran
KPCPL
-UPCL
18-Apr-18 18-Apr-18 0000-0200: 6.28 MW
0200-0300: 5.76 MW
0300-0400: 6.17 MW
0400-0600: 5.23 MW
0600-0700: 5.61 MW
0700-0800: 5.84 MW
0800-0900: 5.61 MW
0900-1300: 5.23 MW
1300-1400: 6.17 MW
1400-1500: 5.76 MW
1500-1600: 6.28 MW
1600-1700: 6.8 MW
1700-1800: 7.85 MW
1800-1900: 8.17 MW
1900-2000: 7.32 MW
2000-2200: 6.8 MW
2200-2400: 6.28 MW
----
145Apr-18/AP-46972-DA
17-Apr-18
MPPL/12744
dt17-Apr-18
MITTAL
Mizoram
-DLFPL
18-Apr-18 18-Apr-18 0000-1100: .4 MW
1100-2300: 1.5 MW
2300-2400: .4 MW
NER-ER-NR
146Apr-18/AP-46967-DA
17-Apr-18
SPT/OA/4662-DA
dt17-Apr-18
SCL
SCLTPS
-NPCL(UP)
18-Apr-18 18-Apr-18 0000-0100: 58 MW
0100-0200: 53 MW
0200-0300: 48 MW
0300-0400: 37 MW
0400-0500: 32 MW
0500-0600: 21 MW
0600-0700: 37 MW
0900-1000: 11 MW
1000-1100: 37 MW
1100-1300: 39 MW
1300-1500: 29 MW
1500-1600: 53 MW
1600-1700: 48 MW
1700-1800: 37 MW
1800-1900: 21 MW
1900-2300: 58 MW
2300-2400: 28 MW
----
147Apr-18/AP-46971-DA
17-Apr-18
MPPL/12737
dt17-Apr-18
MITTAL
Mizoram
-DLFL
18-Apr-18 18-Apr-18 0000-1100: .7 MW
1100-2300: 1.9 MW
2300-2400: .7 MW
NER-ER-NR
148Apr-18/AP-46965-DA
17-Apr-18
NHPPL/APR/18
dt17-Apr-18
NHPPL
NHPPL
-TPDDL
18-Apr-18 18-Apr-18 0000-0600: 1.93 MW
0600-1200: 1.85 MW
1200-1600: 1.83 MW
1600-1900: 2 MW
1900-2400: 2.15 MW
----
149Apr-18/AP-46970-DA
17-Apr-18
MPPL/930/12757
dt17-Apr-18
MITTAL
Mizoram
-SIPL
18-Apr-18 18-Apr-18 0000-0800: .8 MW
0800-1100: 0 MW
1100-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
150Apr-18/AP-46969-DA
17-Apr-18
06/JITPL/NR-UP/18
dt17-Apr-18
JITPL
JITPL
-NRAILUP
18-Apr-18 18-Apr-18 0000-2400: 7.41 MW ER-NR
151Apr-18/AP-46966-DA
17-Apr-18
MPPL/925/B/12766
dt17-Apr-18
MITTAL
HPPC
-HPSEB
18-Apr-18 18-Apr-18 0600-1800: 300 MW ----
152Apr-18/AP-46976-DA
17-Apr-18
MPPL/929/R/12765
dt17-Apr-18
MITTAL
MPPMCL
-HPPC
18-Apr-18 18-Apr-18 0000-0200: 100 MW
0200-2200: 0 MW
2200-2400: 100 MW
WR-NR
153Apr-18/AP-46964-DA
17-Apr-18
SHEPL/APR/18
dt17-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
18-Apr-18 18-Apr-18 0000-0400: 1.12 MW
0400-1200: 1.16 MW
1200-1500: 1.2 MW
1500-1800: 1.43 MW
1800-2400: 1.67 MW
----
154Apr-18/AP-46993-DA
17-Apr-18
HPPC190418
dt17-Apr-18
HPPC
MPPMCL
-HPPC
19-Apr-18 19-Apr-18 0000-2400: 150 MW WR-NR
155Apr-18/AP-46975-DA
17-Apr-18
HPPC180418
dt17-Apr-18
HPPC
MPPMCL
-HPPC
18-Apr-18 18-Apr-18 0000-2400: 150 MW WR-NR
156Apr-18/AP-46974-DA
17-Apr-18
BYPL/MP/Apr-18/3
dt17-Apr-18
BYPL
MPPMCL
-BYPL
18-Apr-18 18-Apr-18 0000-0200: 30 MW
0200-2400: 0 MW
WR-NR
157Apr-18/AP-46973-DA
17-Apr-18
18 Apr 18/SCF
dt17-Apr-18
ITCWIND
ITCWIND
-ITCLS
18-Apr-18 18-Apr-18 0000-2400: 1 MW SR-WR-NR
158Apr-18/AP-46963-FS
17-Apr-18
PTC/OA/28191
dt16-Apr-18
PTC
HPPC
-BYPL
20-Apr-18 29-Apr-18 1400-1700: 82.57 MW ----
30-Apr-18 30-Apr-18 1400-1600: 82.57 MW
1600-1700: 82.76 MW
----
159Apr-18/AP-46962-FS
17-Apr-18
BYPL/HP/Apr-18/1
dt16-Apr-18
BYPL
HPSEB
-BYPL
20-Apr-18 30-Apr-18 0000-0200: 30 MW
1400-2400: 30 MW
----
160Apr-18/AP-46954-SD
16-Apr-18
MPL/18-19/STOA/55
dt16-Apr-18
Manikaran
KPCPL
-UPCL
17-Apr-18 17-Apr-18 0000-0100: 7.85 MW
0100-0200: 7.53 MW
0200-0300: 7.32 MW
0300-0400: 7.62 MW
0400-0500: 6.8 MW
0500-0600: 6.28 MW
0600-0700: 6.5 MW
0700-0800: 6.54 MW
0800-0900: 6.28 MW
0900-1300: 5.76 MW
1300-1400: 6.17 MW
1400-1500: 6.28 MW
1500-1600: 7.32 MW
1600-1700: 7.85 MW
1700-1800: 10.09 MW
1800-1900: 11.68 MW
1900-2000: 10.46 MW
2000-2100: 9.94 MW
2100-2200: 9.42 MW
2200-2300: 8.89 MW
2300-2400: 8.37 MW
----
161Apr-18/AP-46953-SD
16-Apr-18
PTC/OA/28190
dt16-Apr-18
PTC
BYPL
-HPPC
17-Apr-18 17-Apr-18 0200-0500: 75 MW ----
162Apr-18/AP-46952-SD
16-Apr-18
MPPL/925/R/12754
dt16-Apr-18
MITTAL
HPSEB
-HPPC
17-Apr-18 17-Apr-18 1900-2100: 50 MW ----
163Apr-18/AP-46951-SD
16-Apr-18
MPPL/925/B/12753
dt16-Apr-18
MITTAL
HPPC
-HPSEB
17-Apr-18 17-Apr-18 0600-1800: 200 MW ----
164Apr-18/AP-46961-SD
16-Apr-18
05/JITPL/NR-UP/18
dt16-Apr-18
JITPL
JITPL
-NRAILUP
17-Apr-18 17-Apr-18 0000-2400: 7.41 MW ER-NR
165Apr-18/AP-46950-DA
16-Apr-18
NHPPL/APR/17
dt16-Apr-18
NHPPL
NHPPL
-TPDDL
17-Apr-18 17-Apr-18 0000-0600: 1.93 MW
0600-1200: 1.85 MW
1200-1600: 1.83 MW
1600-1900: 2 MW
1900-2400: 2.15 MW
----
166Apr-18/AP-46958-DA
16-Apr-18
MPPL/941/R/12756
dt16-Apr-18
MITTAL
CESC
-HPPC
17-Apr-18 17-Apr-18 0000-0200: 0 MW
0200-0300: 50 MW
0300-0500: 100 MW
0500-2400: 0 MW
ER-NR
167Apr-18/AP-46949-DA
16-Apr-18
SPT/OA/4661-DA
dt16-Apr-18
SCL
SCLTPS
-NPCL(UP)
17-Apr-18 17-Apr-18 0000-0100: 42 MW
0100-0200: 37 MW
0200-0300: 32 MW
0300-0400: 21 MW
0400-0600: 16 MW
0600-0700: 27 MW
0900-1000: 11 MW
1000-1100: 32 MW
1100-1200: 29 MW
1200-1300: 34 MW
1300-1400: 23 MW
1400-1500: 39 MW
1500-1600: 53 MW
1600-1700: 42 MW
1700-1800: 28 MW
1800-1900: 16 MW
1900-2000: 69 MW
2000-2100: 70 MW
2100-2200: 64 MW
2200-2300: 63 MW
2300-2400: 18 MW
----
168Apr-18/AP-46957-DA
16-Apr-18
MPPL/12736
dt16-Apr-18
MITTAL
Mizoram
-DLFL
17-Apr-18 17-Apr-18 0000-1100: .7 MW
1100-2300: 1.9 MW
2300-2400: .7 MW
NER-ER-NR
169Apr-18/AP-46956-DA
16-Apr-18
MPPL/12743
dt16-Apr-18
MITTAL
Mizoram
-DLFPL
17-Apr-18 17-Apr-18 0000-1100: .4 MW
1100-2300: 1.5 MW
2300-2400: .4 MW
NER-ER-NR
170Apr-18/AP-46948-DA
16-Apr-18
10-BYPL/April-18(DA)
dt16-Apr-18
HPSEB
BYPL
-HPSEB
17-Apr-18 17-Apr-18 0200-0300: 60 MW
0300-0500: 75 MW
----
171Apr-18/AP-46960-DA
16-Apr-18
17 Apr 18/SCF
dt16-Apr-18
ITCWIND
ITCWIND
-ITCLS
17-Apr-18 17-Apr-18 0000-2400: 1 MW SR-WR-NR
172Apr-18/AP-46959-DA
16-Apr-18
HPPC170418
dt16-Apr-18
HPPC
MPPMCL
-HPPC
17-Apr-18 17-Apr-18 0000-2400: 150 MW WR-NR
173Apr-18/AP-46947-DA
16-Apr-18
SHEPL/APR/17
dt16-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
17-Apr-18 17-Apr-18 0000-0400: 1.24 MW
0400-1200: 1.28 MW
1200-1500: 1.24 MW
1500-1800: 1.28 MW
1800-2400: 1.57 MW
----
174Apr-18/AP-46946-FS
16-Apr-18
PTC/OA/28185
dt14-Apr-18
PTC
BYPL
-HPPC
18-Apr-18 20-Apr-18 0200-0300: 100 MW
0300-0500: 125 MW
----
21-Apr-18 25-Apr-18 0200-0300: 60 MW
0300-0500: 80 MW
----
175Apr-18/AP-46955-DA
16-Apr-18
MPPL/930/12715
dt16-Apr-18
MITTAL
Mizoram
-SIPL
17-Apr-18 17-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
176Apr-18/AP-46937-DA
15-Apr-18
MPL/18-19/STOA/54
dt15-Apr-18
Manikaran
KPCPL
-UPCL
16-Apr-18 16-Apr-18 0000-0200: 6.86 MW
0200-0400: 6.44 MW
0400-0600: 6.12 MW
0600-1400: 5.81 MW
1400-1500: 6.33 MW
1500-1600: 7.39 MW
1600-2000: 7.92 MW
2000-2200: 7.39 MW
2200-2400: 6.86 MW
----
177Apr-18/AP-46936-DA
15-Apr-18
SPT/OA/4660-DA
dt15-Apr-18
SCL
SCLTPS
-NPCL(UP)
16-Apr-18 16-Apr-18 1000-2300: 25 MW
2300-2400: 6 MW
----
178Apr-18/AP-46945-DA
15-Apr-18
16 APR 18/SCF
dt15-Apr-18
ITCWIND
ITCWIND
-ITCLS
16-Apr-18 16-Apr-18 0000-2400: 1 MW SR-WR-NR
179Apr-18/AP-46935-DA
15-Apr-18
MPPL/925/R/12752
dt15-Apr-18
MITTAL
HPSEB
-HPPC
16-Apr-18 16-Apr-18 1900-2000: 125 MW ----
180Apr-18/AP-46934-DA
15-Apr-18
PTC/OA/28178
dt15-Apr-18
PTC
SCLTPS
-NEPAL
16-Apr-18 16-Apr-18 0000-2400: 10 MW ----
181Apr-18/AP-46942-DA
15-Apr-18
APPCPL/151/3184
dt15-Apr-18
APPCPL
JITPL
-NPCL(UP)
16-Apr-18 16-Apr-18 0000-1900: 0 MW
1900-2300: 25 MW
2300-2400: 0 MW
ER-NR
182Apr-18/AP-46941-DA
15-Apr-18
04/JITPL/NR-UP/18
dt15-Apr-18
JITPL
JITPL
-NRAILUP
16-Apr-18 16-Apr-18 0000-2400: 7.41 MW ER-NR
183Apr-18/AP-46944-DA
15-Apr-18
BRPL/MP/0418-1
dt15-Apr-18
BRPL
MPPMCL
-BRPL
16-Apr-18 16-Apr-18 0000-2400: 75 MW WR-NR
184Apr-18/AP-46933-DA
15-Apr-18
SHEPL/APR/16
dt15-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
16-Apr-18 16-Apr-18 0000-0400: 1.15 MW
0400-1200: 1.18 MW
1200-1500: 1.22 MW
1500-1800: 1.3 MW
1800-2400: 1.53 MW
----
185Apr-18/AP-46932-DA
15-Apr-18
NHPPL/APR/16
dt15-Apr-18
NHPPL
NHPPL
-TPDDL
16-Apr-18 16-Apr-18 0000-0600: 1.77 MW
0600-1200: 1.75 MW
1200-1800: 1.79 MW
1800-2400: 2 MW
----
186Apr-18/AP-46940-DA
15-Apr-18
MPPL/12742
dt15-Apr-18
MITTAL
Mizoram
-DLFPL
16-Apr-18 16-Apr-18 0000-1100: .4 MW
1100-2300: 1.5 MW
2300-2400: .4 MW
NER-ER-NR
187Apr-18/AP-46939-DA
15-Apr-18
MPPL/12735
dt15-Apr-18
MITTAL
Mizoram
-DLFL
16-Apr-18 16-Apr-18 0000-1100: .7 MW
1100-2300: 1.9 MW
2300-2400: .7 MW
NER-ER-NR
188Apr-18/AP-46938-DA
15-Apr-18
MPPL/930/12714
dt15-Apr-18
MITTAL
Mizoram
-SIPL
16-Apr-18 16-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
189Apr-18/AP-46931-DA
14-Apr-18
APPCPL/147/5/3180
dt14-Apr-18
APPCPL
HPSEB
-TIHCL
16-Apr-18 16-Apr-18 0000-2400: 1 MW ----
190Apr-18/AP-46930-DA
14-Apr-18
APPCPL/147/3/3179
dt14-Apr-18
APPCPL
HPSEB
-AHCSPL
16-Apr-18 16-Apr-18 0000-2400: 1.2 MW ----
191Apr-18/AP-46923-SD
14-Apr-18
APPCPL/156/3182
dt14-Apr-18
APPCPL
TPDDL
-HPSEB
15-Apr-18 15-Apr-18 0000-2400: 100 MW ----
192Apr-18/AP-46922-DA
14-Apr-18
NHPPL/APR/15
dt14-Apr-18
NHPPL
NHPPL
-TPDDL
15-Apr-18 15-Apr-18 0000-0600: 1.78 MW
0600-1200: 1.76 MW
1200-1800: 1.8 MW
1800-2400: 2 MW
----
193Apr-18/AP-46921-DA
14-Apr-18
SHEPL/APR/15
dt14-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
15-Apr-18 15-Apr-18 0000-0400: 1.3 MW
0400-1200: 1.19 MW
1200-1500: 1.23 MW
1500-1800: 1.3 MW
1800-2400: 1.74 MW
----
194Apr-18/AP-46920-DA
14-Apr-18
PTC/OA/28184
dt14-Apr-18
PTC
BYPL
-HPPC
15-Apr-18 15-Apr-18 0200-0400: 100 MW
0400-0500: 150 MW
----
195Apr-18/AP-46919-DA
14-Apr-18
MPL/18-19/STOA/53
dt14-Apr-18
Manikaran
KPCPL
-UPCL
15-Apr-18 15-Apr-18 0000-0200: 6.95 MW
0200-0400: 6.52 MW
0400-0600: 6.2 MW
0600-1400: 5.88 MW
1400-1500: 6.41 MW
1500-1600: 7.48 MW
1600-2000: 8.02 MW
2000-2200: 7.48 MW
2200-2400: 6.95 MW
----
196Apr-18/AP-46928-DA
14-Apr-18
03/JITPL/NR-UP/18
dt14-Apr-18
JITPL
JITPL
-NRAILUP
15-Apr-18 15-Apr-18 0000-2400: 7.38 MW ER-NR
197Apr-18/AP-46929-DA
14-Apr-18
15 APR 18/SCF
dt14-Apr-18
ITCWIND
ITCWIND
-ITCLS
15-Apr-18 15-Apr-18 0000-2400: 1 MW SR-WR-NR
198Apr-18/AP-46918-DA
14-Apr-18
PTC/OA/28177
dt14-Apr-18
PTC
SCLTPS
-NEPAL
15-Apr-18 15-Apr-18 0000-2400: 10 MW ----
199Apr-18/AP-46917-DA
14-Apr-18
MPPL/925/R/12751
dt14-Apr-18
MITTAL
HPSEB
-HPPC
15-Apr-18 15-Apr-18 1900-2100: 100 MW ----
200Apr-18/AP-46916-DA
14-Apr-18
MPPL/925/B/12750
dt14-Apr-18
MITTAL
HPPC
-HPSEB
15-Apr-18 15-Apr-18 0800-1800: 100 MW ----
201Apr-18/AP-46927-DA
14-Apr-18
MPPL/12734
dt14-Apr-18
MITTAL
Mizoram
-DLFL
15-Apr-18 15-Apr-18 0000-1100: .7 MW
1100-2300: 1.9 MW
2300-2400: .7 MW
NER-ER-NR
202Apr-18/AP-46926-DA
14-Apr-18
MPPL/12741
dt14-Apr-18
MITTAL
Mizoram
-DLFPL
15-Apr-18 15-Apr-18 0000-1100: .4 MW
1100-2300: 1.5 MW
2300-2400: .4 MW
NER-ER-NR
203Apr-18/AP-46925-DA
14-Apr-18
MPPL/930/12713
dt14-Apr-18
MITTAL
Mizoram
-SIPL
15-Apr-18 15-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
204Apr-18/AP-46924-DA
13-Apr-18
APPCPL/108/3101/4/9
dt13-Apr-18
APPCPL
Sikkim
-AHCSPL
15-Apr-18 15-Apr-18 0000-0800: .9 MW
0800-2000: 1.1 MW
2000-2400: .9 MW
ER-NR
205Apr-18/AP-46943-DA
13-Apr-18
HPPC160418
dt13-Apr-18
HPPC
MPPMCL
-HPPC
16-Apr-18 16-Apr-18 0000-2400: 150 MW WR-NR
206Apr-18/AP-46909-SD
13-Apr-18
SHEPL/APR/14
dt13-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
14-Apr-18 14-Apr-18 0000-0400: 1.23 MW
0400-1200: 1.07 MW
1200-1400: 1.15 MW
1400-1700: 1.3 MW
1700-2400: 1.6 MW
----
207Apr-18/AP-46915-SD
13-Apr-18
01/JITPL/NR-UP/18
dt13-Apr-18
JITPL
JITPL
-NRAILUP
14-Apr-18 14-Apr-18 0000-2400: 7.43 MW ER-NR
208Apr-18/AP-46905-SD
13-Apr-18
MPL/18-19/STOA/52
dt13-Apr-18
Manikaran
KPCPL
-UPCL
13-Apr-18 13-Apr-18 1730-2100: 2.34 MW
2100-2300: 1.88 MW
2300-2400: 1.41 MW
----
209Apr-18/AP-46908-DA
13-Apr-18
APPCPL/156/3181
dt13-Apr-18
APPCPL
TPDDL
-HPSEB
14-Apr-18 14-Apr-18 0000-0600: 200 MW
0600-1800: 150 MW
----
210Apr-18/AP-46913-DA
13-Apr-18
APPCPL/108/3101/4/8
dt13-Apr-18
APPCPL
Sikkim
-AHCSPL
14-Apr-18 14-Apr-18 0000-0800: .9 MW
0800-2000: 1.1 MW
2000-2400: .9 MW
ER-NR
211Apr-18/AP-46914-DA
13-Apr-18
14 Apr 18/SCF
dt13-Apr-18
ITCWIND
ITCWIND
-ITCLS
14-Apr-18 14-Apr-18 0000-2400: 1 MW SR-WR-NR
212Apr-18/AP-46907-DA
13-Apr-18
MPL/18-19/STOA/49
dt13-Apr-18
Manikaran
KPCPL
-UPCL
14-Apr-18 14-Apr-18 0000-0200: 7.07 MW
0200-0400: 6.64 MW
0400-0600: 6.31 MW
0600-0800: 5.98 MW
0800-1300: 5.77 MW
1300-1400: 5.98 MW
1400-1500: 6.53 MW
1500-1600: 7.07 MW
1600-1700: 7.61 MW
1700-2000: 8.16 MW
2000-2200: 7.61 MW
2200-2400: 7.07 MW
----
213Apr-18/AP-46912-DA
13-Apr-18
MPPL/12740
dt13-Apr-18
MITTAL
Mizoram
-DLFPL
14-Apr-18 14-Apr-18 0000-1100: .4 MW
1100-2300: 1.5 MW
2300-2400: .4 MW
NER-ER-NR
214Apr-18/AP-46911-DA
13-Apr-18
MPPL/12733
dt13-Apr-18
MITTAL
Mizoram
-DLFL
14-Apr-18 14-Apr-18 0000-1100: .7 MW
1100-2300: 1.9 MW
2300-2400: .7 MW
NER-ER-NR
215Apr-18/AP-46910-DA
13-Apr-18
MPPL/930/12712
dt13-Apr-18
MITTAL
Mizoram
-SIPL
14-Apr-18 14-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
216Apr-18/AP-46906-DA
13-Apr-18
NHPPL/APR/14
dt13-Apr-18
NHPPL
NHPPL
-TPDDL
14-Apr-18 14-Apr-18 0000-0600: 1.74 MW
0600-1200: 1.68 MW
1200-1800: 1.76 MW
1800-2400: 1.89 MW
----
217Apr-18/AP-46904-FS
13-Apr-18
GBHPL/UPCL/16-200418
dt12-Apr-18
BUDHIL
BUDHIL
-UPCL
16-Apr-18 20-Apr-18 0530-0600: 59.6 MW
2100-2400: 59.6 MW
----
218Apr-18/AP-46903-FS
13-Apr-18
APPCPL/147/3/3059
dt12-Apr-18
APPCPL
HPSEB
-AHCSPL
17-Apr-18 30-Apr-18 0000-2400: 1.2 MW ----
219Apr-18/AP-46902-FS
13-Apr-18
APPCPL/147/5/3061
dt12-Apr-18
APPCPL
HPSEB
-TIHCL
17-Apr-18 30-Apr-18 0000-2400: 1 MW ----
220Apr-18/AP-46901-FS
13-Apr-18
PTC/OA/28143
dt11-Apr-18
PTC
BSHEP-JK
-IMCL
16-Apr-18 30-Apr-18 0000-2400: 1.2 MW ----
221Apr-18/AP-46897-SD
12-Apr-18
MPL/18-19/STOA/48
dt12-Apr-18
Manikaran
KPCPL
-UPCL
13-Apr-18 13-Apr-18 0000-0100: 6.1 MW
0100-0400: 5.81 MW
0400-1300: 5.63 MW
1300-1400: 5.91 MW
1400-1500: 6.1 MW
1500-1600: 6.38 MW
1600-1700: 6.56 MW
1700-2000: 7.03 MW
2000-2200: 6.56 MW
2200-2300: 6.38 MW
2300-2400: 6 MW
----
222Apr-18/AP-46896-SD
12-Apr-18
09-BYPL/April-18(DA)
dt12-Apr-18
HPSEB
BYPL
-HPSEB
13-Apr-18 13-Apr-18 0000-0200: 40 MW
0200-0900: 110 MW
----
223Apr-18/AP-46895-SD
12-Apr-18
SHEPL/APR/13
dt12-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
13-Apr-18 13-Apr-18 0000-0400: 1.23 MW
0400-1400: 1.16 MW
1400-1700: 1.31 MW
1700-2400: 1.43 MW
----
224Apr-18/AP-46894-DA
12-Apr-18
PTC/OA/28168
dt12-Apr-18
PTC
SCLTPS
-NEPAL
13-Apr-18 13-Apr-18 0000-2400: 10 MW ----
225Apr-18/AP-46893-DA
12-Apr-18
MPPL/925/R/12731
dt12-Apr-18
MITTAL
HPSEB
-HPPC
13-Apr-18 13-Apr-18 1900-2130: 150 MW
2130-2400: 75 MW
----
226Apr-18/AP-46900-DA
12-Apr-18
13 Apr 18/SCF
dt12-Apr-18
ITCWIND
ITCWIND
-ITCLS
13-Apr-18 13-Apr-18 0000-2400: 1 MW SR-WR-NR
227Apr-18/AP-46891-DA
12-Apr-18
MPPL/925/B/12730
dt12-Apr-18
MITTAL
HPPC
-HPSEB
13-Apr-18 13-Apr-18 0900-1730: 150 MW ----
228Apr-18/AP-46899-DA
12-Apr-18
MPPL/930/12711
dt12-Apr-18
MITTAL
Mizoram
-SIPL
13-Apr-18 13-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
229Apr-18/AP-46892-DA
12-Apr-18
NHPPL/APR/13
dt12-Apr-18
NHPPL
NHPPL
-TPDDL
13-Apr-18 13-Apr-18 0000-0600: 1.78 MW
0600-1200: 1.68 MW
1200-1800: 1.76 MW
1800-2400: 1.91 MW
----
230Apr-18/AP-46898-DA
11-Apr-18
APPCPL/108/3101/4/7
dt11-Apr-18
APPCPL
Sikkim
-AHCSPL
13-Apr-18 13-Apr-18 0000-0800: .9 MW
0800-2000: 1.1 MW
2000-2400: .9 MW
ER-NR
231Apr-18/AP-46887-SD
11-Apr-18
NHPPL/APR/12
dt11-Apr-18
NHPPL
NHPPL
-TPDDL
12-Apr-18 12-Apr-18 0000-0600: 1.78 MW
0600-1200: 1.68 MW
1200-1800: 1.76 MW
1800-2400: 1.83 MW
----
232Apr-18/AP-46886-SD
11-Apr-18
SHEPL/APR/12
dt11-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
12-Apr-18 12-Apr-18 0000-0400: 1 MW
0400-1400: 1.07 MW
1400-1900: 1.16 MW
1900-2400: 1.2 MW
----
233Apr-18/AP-46885-SD
11-Apr-18
APPCPL/156/3164
dt11-Apr-18
APPCPL
TPDDL
-HPSEB
12-Apr-18 12-Apr-18 0000-1030: 150 MW
1030-1300: 50 MW
1300-1400: 150 MW
1400-1700: 50 MW
1700-1800: 150 MW
----
234Apr-18/AP-46884-SD
11-Apr-18
MPL/18-19/STOA/47
dt11-Apr-18
Manikaran
KPCPL
-UPCL
12-Apr-18 12-Apr-18 0000-0100: 5.63 MW
0100-0200: 5.82 MW
0200-0300: 6.85 MW
0300-0400: 7.14 MW
0400-0500: 6.67 MW
0500-0600: 6.1 MW
0600-0700: 7.04 MW
0700-0800: 7.51 MW
0800-0900: 7.04 MW
0900-1000: 5.91 MW
1000-1100: 5.63 MW
1100-1200: 5.44 MW
1200-1300: 5.63 MW
1300-1400: 7.04 MW
1400-1500: 6.1 MW
1500-1600: 6.85 MW
1600-1700: 7.98 MW
1700-1800: 9.01 MW
1800-1900: 9.39 MW
1900-2100: 7.98 MW
2100-2200: 7.79 MW
2200-2300: 6.57 MW
2300-2400: 5.72 MW
----
235Apr-18/AP-46883-DA
11-Apr-18
PTC/OA/28156
dt11-Apr-18
PTC
SCLTPS
-NEPAL
12-Apr-18 12-Apr-18 0000-2400: 10 MW ----
236Apr-18/AP-46882-DA
11-Apr-18
MPPL/925/R/12728
dt11-Apr-18
MITTAL
HPSEB
-HPPC
12-Apr-18 12-Apr-18 1900-2130: 100 MW ----
237Apr-18/AP-46881-DA
11-Apr-18
MPPL/925/B/12727
dt11-Apr-18
MITTAL
HPPC
-HPSEB
12-Apr-18 12-Apr-18 1030-1630: 75 MW ----
238Apr-18/AP-46890-DA
11-Apr-18
12 Apr 18/SCF
dt11-Apr-18
ITCWIND
ITCWIND
-ITCLS
12-Apr-18 12-Apr-18 0000-2400: 1 MW SR-WR-NR
239Apr-18/AP-46889-DA
11-Apr-18
MPPL/930/12710
dt11-Apr-18
MITTAL
Mizoram
-SIPL
12-Apr-18 12-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
240Apr-18/AP-46888-DA
10-Apr-18
APPCPL/108/3101/4/6
dt10-Apr-18
APPCPL
Sikkim
-AHCSPL
12-Apr-18 12-Apr-18 0000-0800: .9 MW
0800-2000: 1.1 MW
2000-2400: .9 MW
ER-NR
241Apr-18/AP-46880-SD
10-Apr-18
PTC/OA/28155
dt10-Apr-18
PTC
SCLTPS
-NEPAL
11-Apr-18 11-Apr-18 0000-2400: 10 MW ----
242Apr-18/AP-46875-SD
10-Apr-18
MPL/18-19/STOA/30
dt10-Apr-18
Manikaran
KPCPL
-UPCL
11-Apr-18 11-Apr-18 0000-0100: 6.12 MW
0100-0200: 6.59 MW
0200-0300: 6.78 MW
0300-0400: 7.72 MW
0400-0600: 7.53 MW
0600-0800: 7.34 MW
0800-0900: 6.78 MW
0900-1000: 5.83 MW
1000-1100: 6.31 MW
1100-1200: 4.71 MW
1200-1400: 5.93 MW
1400-1500: 5.65 MW
1500-1600: 7.06 MW
1600-1700: 9.22 MW
1700-1800: 9.88 MW
1800-1900: 10.82 MW
1900-2000: 10.35 MW
2000-2100: 9.88 MW
2100-2200: 8.94 MW
2200-2300: 6.59 MW
2300-2400: 7.06 MW
----
243Apr-18/AP-46874-DA
10-Apr-18
APPCPL/156/3160
dt10-Apr-18
APPCPL
TPDDL
-HPSEB
11-Apr-18 11-Apr-18 0000-0300: 50 MW
0300-0500: 100 MW
0500-0900: 200 MW
0900-1000: 100 MW
1300-1400: 100 MW
1800-2200: 50 MW
----
244Apr-18/AP-46873-DA
10-Apr-18
GBHPL/UPCL/12042018
dt10-Apr-18
BUDHIL
BUDHIL
-UPCL
12-Apr-18 12-Apr-18 1000-1100: 59.6 MW ----
245Apr-18/AP-46872-DA
10-Apr-18
08-BYPL/April-18(DA)
dt10-Apr-18
HPSEB
BYPL
-HPSEB
11-Apr-18 11-Apr-18 0200-0500: 100 MW ----
246Apr-18/AP-46871-DA
10-Apr-18
GBHPL/UPCL/11042018
dt10-Apr-18
BUDHIL
BUDHIL
-UPCL
11-Apr-18 11-Apr-18 1000-1100: 59.6 MW ----
247Apr-18/AP-46870-DA
10-Apr-18
SHEPL/APR/11
dt10-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
11-Apr-18 11-Apr-18 0000-0400: 1 MW
0400-1400: 1.07 MW
1400-1700: 1.12 MW
1700-2400: 1.2 MW
----
248Apr-18/AP-46878-DA
10-Apr-18
MPPL/941/R/12725
dt10-Apr-18
MITTAL
CESC
-HPPC
11-Apr-18 11-Apr-18 0000-0015: 50 MW
0015-0600: 80 MW
0600-2400: 0 MW
ER-NR
249Apr-18/AP-46869-DA
10-Apr-18
MPPL/925/R/12723
dt10-Apr-18
MITTAL
HPSEB
-HPPC
11-Apr-18 11-Apr-18 1900-2130: 150 MW ----
250Apr-18/AP-46879-DA
10-Apr-18
11 APR 18/SCF
dt10-Apr-18
ITCWIND
ITCWIND
-ITCLS
11-Apr-18 11-Apr-18 0000-2400: 1 MW SR-WR-NR
251Apr-18/AP-46868-DA
10-Apr-18
MPPL/925/B/12722
dt10-Apr-18
MITTAL
HPPC
-HPSEB
11-Apr-18 11-Apr-18 0600-0800: 100 MW
0800-1700: 300 MW
1700-1800: 200 MW
----
252Apr-18/AP-46877-DA
10-Apr-18
APPCPL/108/3101/4/5
dt10-Apr-18
APPCPL
Sikkim
-AHCSPL
11-Apr-18 11-Apr-18 0000-0800: .9 MW
0800-2000: 1.1 MW
2000-2400: .9 MW
ER-NR
253Apr-18/AP-46876-DA
10-Apr-18
MPPL/930/12709
dt10-Apr-18
MITTAL
Mizoram
-SIPL
11-Apr-18 11-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
254Apr-18/AP-46866-FS
10-Apr-18
GBHPL/UPCL/13-150418
dt09-Apr-18
BUDHIL
BUDHIL
-UPCL
13-Apr-18 15-Apr-18 1000-1100: 59.6 MW ----
255Apr-18/AP-46867-DA
10-Apr-18
NHPPL/APR/11
dt10-Apr-18
NHPPL
NHPPL
-TPDDL
11-Apr-18 11-Apr-18 0000-0600: 1.78 MW
0600-1200: 1.68 MW
1200-1800: 1.76 MW
1800-2400: 1.83 MW
----
256Apr-18/AP-46861-SD
09-Apr-18
APPCPL/156/3152
dt09-Apr-18
APPCPL
TPDDL
-HPSEB
10-Apr-18 10-Apr-18 0000-0800: 200 MW
0800-0900: 100 MW
0900-2400: 50 MW
----
257Apr-18/AP-46860-DA
09-Apr-18
NHPPL/APR/10
dt09-Apr-18
NHPPL
NHPPL
-TPDDL
10-Apr-18 10-Apr-18 0000-0400: 1.85 MW
0400-0600: 1.78 MW
0600-1200: 1.7 MW
1200-1600: 1.85 MW
1600-2200: 1.94 MW
2200-2400: 1.88 MW
----
258Apr-18/AP-46859-DA
09-Apr-18
MPL/18-19/STOA/27
dt09-Apr-18
Manikaran
KPCPL
-UPCL
10-Apr-18 10-Apr-18 0000-0100: 6.59 MW
0100-0200: 6.4 MW
0200-0300: 6.12 MW
0300-0400: 5.83 MW
0400-0700: 5.65 MW
0700-0800: 5.46 MW
0800-0900: 5.18 MW
0900-1100: 4.89 MW
1100-1200: 5.18 MW
1200-1400: 5.46 MW
1400-1500: 5.65 MW
1500-1600: 6.12 MW
1600-1700: 6.4 MW
1700-1800: 7.06 MW
1800-2100: 7.53 MW
2100-2200: 7.06 MW
2200-2300: 6.59 MW
2300-2400: 6.12 MW
----
259Apr-18/AP-46858-DA
09-Apr-18
MPPL/925/R/12705
dt09-Apr-18
MITTAL
HPSEB
-HPPC
10-Apr-18 10-Apr-18 1900-2130: 125 MW ----
260Apr-18/AP-46856-DA
09-Apr-18
MPPL/925/B/12704
dt09-Apr-18
MITTAL
HPPC
-HPSEB
10-Apr-18 10-Apr-18 0800-0900: 200 MW
0900-1800: 250 MW
----
261Apr-18/AP-46864-DA
09-Apr-18
MPPL/12707
dt09-Apr-18
MITTAL
CESC
-HPPC
10-Apr-18 10-Apr-18 0000-0015: 0 MW
0015-0030: 50 MW
0030-0600: 75 MW
0600-2400: 0 MW
ER-NR
262Apr-18/AP-46863-DA
09-Apr-18
APPCPL/108/3101/4/4
dt09-Apr-18
APPCPL
Sikkim
-AHCSPL
10-Apr-18 10-Apr-18 0000-0800: .9 MW
0800-2000: 1.1 MW
2000-2400: .9 MW
ER-NR
263Apr-18/AP-46865-DA
09-Apr-18
10 APR 18/SCF
dt09-Apr-18
ITCWIND
ITCWIND
-ITCLS
10-Apr-18 10-Apr-18 0000-2400: 1 MW SR-WR-NR
264Apr-18/AP-46857-DA
09-Apr-18
SHEPL/APR/10
dt09-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
10-Apr-18 10-Apr-18 0000-1400: 1.23 MW
1400-1700: 1.27 MW
1700-2400: 1.38 MW
----
265Apr-18/AP-46855-FS
09-Apr-18
APPCPL/147/1/3057
dt07-Apr-18
APPCPL
HPSEB
-RGCIRC
16-Apr-18 30-Apr-18 0000-2400: 1 MW ----
266Apr-18/AP-46862-DA
09-Apr-18
MPPL/930/12690
dt09-Apr-18
MITTAL
Mizoram
-SIPL
10-Apr-18 10-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
267Apr-18/AP-46850-SD
08-Apr-18
APPCPL/156/3151
dt08-Apr-18
APPCPL
TPDDL
-HPSEB
09-Apr-18 09-Apr-18 0100-0300: 50 MW
0300-0500: 100 MW
0500-0700: 200 MW
0700-0800: 150 MW
----
268Apr-18/AP-46849-DA
08-Apr-18
SHEPL/APR/09
dt08-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
09-Apr-18 09-Apr-18 0000-1400: 1.23 MW
1400-1700: 1.3 MW
1700-2400: 1.42 MW
----
269Apr-18/AP-46848-DA
08-Apr-18
NHPPL/APR/09
dt08-Apr-18
NHPPL
NHPPL
-TPDDL
09-Apr-18 09-Apr-18 0000-0400: 1.86 MW
0400-0600: 1.78 MW
0600-1200: 1.68 MW
1200-1600: 1.85 MW
1600-2200: 1.94 MW
2200-2400: 1.85 MW
----
270Apr-18/AP-46847-DA
08-Apr-18
MPPL/925/R/12702
dt08-Apr-18
MITTAL
HPSEB
-HPPC
09-Apr-18 09-Apr-18 1900-2130: 100 MW ----
271Apr-18/AP-46846-DA
08-Apr-18
MPPL/925/B/12701
dt08-Apr-18
MITTAL
HPPC
-HPSEB
09-Apr-18 09-Apr-18 0600-0700: 150 MW
0700-1700: 300 MW
1700-1800: 200 MW
----
272Apr-18/AP-46854-DA
08-Apr-18
09 Apr 18/SCF
dt08-Apr-18
ITCWIND
ITCWIND
-ITCLS
09-Apr-18 09-Apr-18 0000-2400: 1 MW SR-WR-NR
273Apr-18/AP-46845-DA
08-Apr-18
MPL/18-19/STOA/24
dt08-Apr-18
Manikaran
KPCPL
-UPCL
09-Apr-18 09-Apr-18 0000-0200: 7.53 MW
0200-0600: 6.96 MW
0600-0900: 6.78 MW
0900-1300: 6.12 MW
1300-1500: 6.59 MW
1500-1700: 7.06 MW
1700-1800: 7.53 MW
1800-1900: 8 MW
1900-2000: 8.75 MW
2000-2200: 8.94 MW
2200-2300: 8.47 MW
2300-2400: 8.28 MW
----
274Apr-18/AP-46844-SD
08-Apr-18
MPL/18-19/STOA/25
dt08-Apr-18
Manikaran
KPCPL
-UPCL
08-Apr-18 08-Apr-18 1245-1600: .94 MW
1600-1800: 1.41 MW
1800-2100: 1.88 MW
2100-2300: 1.41 MW
2300-2400: .94 MW
----
275Apr-18/AP-46853-DA
08-Apr-18
MPPL/930/12689
dt08-Apr-18
MITTAL
Mizoram
-SIPL
09-Apr-18 09-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
276Apr-18/AP-46852-DA
07-Apr-18
APPCPL/108/3101/4/3
dt07-Apr-18
APPCPL
Sikkim
-AHCSPL
09-Apr-18 09-Apr-18 0000-0800: .9 MW
0800-2000: 1.1 MW
2000-2400: .9 MW
ER-NR
277Apr-18/AP-46851-DA
07-Apr-18
APPCPL/118/3138
dt07-Apr-18
APPCPL
MeSEB
-LPCL
09-Apr-18 09-Apr-18 0000-2400: .6 MW NER-ER-NR
278Apr-18/AP-46839-SD
07-Apr-18
07-BYPL/April-18(DA)
dt07-Apr-18
HPSEB
BYPL
-HPSEB
08-Apr-18 08-Apr-18 0100-1000: 75 MW
1000-1400: 20 MW
----
279Apr-18/AP-46838-SD
07-Apr-18
APPCPL/156/3146
dt07-Apr-18
APPCPL
TPDDL
-HPSEB
08-Apr-18 08-Apr-18 0200-0500: 50 MW
0500-0700: 150 MW
0700-0900: 100 MW
----
280Apr-18/AP-46837-DA
07-Apr-18
MPPL/925/B/12700
dt07-Apr-18
MITTAL
HPPC
-HPSEB
08-Apr-18 08-Apr-18 0600-1800: 150 MW ----
281Apr-18/AP-46836-DA
07-Apr-18
NHPPL/APR/08
dt07-Apr-18
NHPPL
NHPPL
-TPDDL
08-Apr-18 08-Apr-18 0000-0400: 1.81 MW
0400-0600: 1.74 MW
0600-1200: 1.66 MW
1200-1600: 1.81 MW
1600-2200: 1.89 MW
2200-2400: 1.81 MW
----
282Apr-18/AP-46835-DA
07-Apr-18
MPL/18-19/STOA/22
dt07-Apr-18
Manikaran
KPCPL
-UPCL
08-Apr-18 08-Apr-18 0000-0200: 6.08 MW
0200-0300: 5.61 MW
0300-0700: 5.14 MW
0700-0800: 4.96 MW
0800-1300: 4.68 MW
1300-1500: 5.14 MW
1500-1600: 5.61 MW
1600-1800: 6.08 MW
1800-2100: 7.02 MW
2100-2300: 6.55 MW
2300-2400: 6.08 MW
----
283Apr-18/AP-46843-DA
07-Apr-18
08 Apr 18/SCF
dt07-Apr-18
ITCWIND
ITCWIND
-ITCLS
08-Apr-18 08-Apr-18 0000-2400: 1 MW SR-WR-NR
284Apr-18/AP-46842-DA
07-Apr-18
APPCPL/108/3101/4/2
dt07-Apr-18
APPCPL
Sikkim
-AHCSPL
08-Apr-18 08-Apr-18 0000-0800: .9 MW
0800-2000: 1.1 MW
2000-2400: .9 MW
ER-NR
285Apr-18/AP-46841-DA
07-Apr-18
APPCPL/118/3117
dt07-Apr-18
APPCPL
MeSEB
-LPCL
08-Apr-18 08-Apr-18 0000-2400: .6 MW NER-ER-NR
286Apr-18/AP-46834-DA
07-Apr-18
SHEPL/APR/08
dt07-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
08-Apr-18 08-Apr-18 0000-0700: 1.22 MW
0700-1400: 1.18 MW
1400-1700: 1.3 MW
1700-2400: 1.41 MW
----
287Apr-18/AP-46840-DA
07-Apr-18
MPPL/930/12688
dt07-Apr-18
MITTAL
Mizoram
-SIPL
08-Apr-18 08-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
288Apr-18/AP-46833-DA
07-Apr-18
PTC/OA/28128
dt07-Apr-18
PTC
SCLTPS
-NEPAL
08-Apr-18 08-Apr-18 0000-2400: 10 MW ----
289Apr-18/AP-46832-SD
06-Apr-18
MPPL/925/B/12699
dt06-Apr-18
MITTAL
HPPC
-HPSEB
07-Apr-18 07-Apr-18 0000-1800: 100 MW ----
290Apr-18/AP-46831-SD
06-Apr-18
APPCPL/108/3101/4/1
dt06-Apr-18
APPCPL
Sikkim
-AHCSPL
07-Apr-18 07-Apr-18 0000-0800: .9 MW
0800-2000: 1.1 MW
2000-2400: .9 MW
ER-NR
291Apr-18/AP-46827-DA
06-Apr-18
MPL/18-19/STOA/19
dt06-Apr-18
Manikaran
KPCPL
-UPCL
07-Apr-18 07-Apr-18 0000-0300: 5.61 MW
0300-0700: 5.14 MW
0700-0800: 4.96 MW
0800-1300: 4.68 MW
1300-1500: 5.14 MW
1500-1600: 5.61 MW
1600-1800: 6.08 MW
1800-2100: 7.02 MW
2100-2300: 6.55 MW
2300-2400: 6.08 MW
----
292Apr-18/AP-46826-DA
06-Apr-18
NHPPL/APR/07
dt06-Apr-18
NHPPL
NHPPL
-TPDDL
07-Apr-18 07-Apr-18 0000-0400: 2.15 MW
0400-0600: 2.08 MW
0600-0900: 2 MW
0900-1500: 1.92 MW
1500-1700: 2.08 MW
1700-2000: 2.31 MW
2000-2400: 2.15 MW
----
293Apr-18/AP-46830-DA
06-Apr-18
APPCPL/118/3116
dt06-Apr-18
APPCPL
MeSEB
-LPCL
07-Apr-18 07-Apr-18 0000-2400: .6 MW NER-ER-NR
294Apr-18/AP-46820-FS
06-Apr-18
PTC/OA/28129
dt05-Apr-18
PTC
SCLTPS
-NEPAL
09-Apr-18 10-Apr-18 0000-2400: 10 MW ----
295Apr-18/AP-46819-FS
06-Apr-18
GBHPL/UPCL/09-100418
dt05-Apr-18
BUDHIL
BUDHIL
-UPCL
09-Apr-18 10-Apr-18 1000-1200: 59.6 MW ----
296Apr-18/AP-46825-DA
06-Apr-18
MPPL/925/B/12695
dt06-Apr-18
MITTAL
HPPC
-HPSEB
07-Apr-18 07-Apr-18 0700-1800: 150 MW ----
297Apr-18/AP-46824-DA
06-Apr-18
06-BYPL/April-18(DA)
dt06-Apr-18
HPSEB
BYPL
-HPSEB
07-Apr-18 07-Apr-18 0200-0300: 50 MW
0300-0500: 75 MW
----
298Apr-18/AP-46829-DA
06-Apr-18
07 Apr 18/SCF
dt06-Apr-18
ITCWIND
ITCWIND
-ITCLS
07-Apr-18 07-Apr-18 0000-2400: 1 MW SR-WR-NR
299Apr-18/AP-46823-DA
06-Apr-18
SHEPL/APR/07
dt06-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
07-Apr-18 07-Apr-18 0000-0200: 1.88 MW
0200-0400: 1.48 MW
0400-1000: 1.33 MW
1000-1400: 1.52 MW
1400-1700: 1.76 MW
1700-2400: 2.11 MW
----
300Apr-18/AP-46828-DA
06-Apr-18
MPPL/930/12687
dt06-Apr-18
MITTAL
Mizoram
-SIPL
07-Apr-18 07-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
301Apr-18/AP-46818-SD
05-Apr-18
APPCPL/118/3115
dt05-Apr-18
APPCPL
MeSEB
-LPCL
06-Apr-18 06-Apr-18 0000-2400: .6 MW NER-ER-NR
302Apr-18/AP-46814-SD
05-Apr-18
05-BYPL/April-18(DA)
dt05-Apr-18
HPSEB
BYPL
-HPSEB
06-Apr-18 06-Apr-18 0200-0300: 50 MW
0300-0500: 75 MW
----
303Apr-18/AP-46813-DA
05-Apr-18
SHEPL/APR/06
dt05-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
06-Apr-18 06-Apr-18 0000-0200: 1.95 MW
0200-0400: 1.76 MW
0400-1000: 1.64 MW
1000-1400: 1.56 MW
1400-1600: 1.8 MW
1600-1800: 2.03 MW
1800-2200: 2.34 MW
2200-2400: 2.19 MW
----
304Apr-18/AP-46812-DA
05-Apr-18
MPL/18-19/STOA/16
dt05-Apr-18
Manikaran
KPCPL
-UPCL
06-Apr-18 06-Apr-18 0000-0100: 7.02 MW
0100-0300: 6.55 MW
0300-0500: 6.08 MW
0500-0800: 5.61 MW
0800-1300: 5.14 MW
1300-1500: 5.61 MW
1500-1600: 6.08 MW
1600-1700: 7.48 MW
1700-2100: 8.89 MW
2100-2200: 8.42 MW
2200-2300: 7.95 MW
2300-2400: 7.48 MW
----
305Apr-18/AP-46815-DA
05-Apr-18
MPPL/930/12686
dt05-Apr-18
MITTAL
Mizoram
-SIPL
06-Apr-18 06-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
306Apr-18/AP-46811-DA
05-Apr-18
MPPL/925/B/12692
dt05-Apr-18
MITTAL
HPPC
-HPSEB
06-Apr-18 06-Apr-18 0700-1800: 150 MW ----
307Apr-18/AP-46817-DA
05-Apr-18
MPPL/929/R/12693
dt05-Apr-18
MITTAL
MPPMCL
-HPPC
06-Apr-18 06-Apr-18 0000-1900: 0 MW
1900-2300: 150 MW
2300-2400: 0 MW
WR-NR
308Apr-18/AP-46810-DA
05-Apr-18
NHPPL/APR/06
dt05-Apr-18
NHPPL
NHPPL
-TPDDL
06-Apr-18 06-Apr-18 0000-0400: 2.85 MW
0400-0600: 2.7 MW
0600-0900: 2.55 MW
0900-1200: 2.47 MW
1200-1500: 2.4 MW
1500-1700: 2.7 MW
1700-2400: 2.93 MW
----
309Apr-18/AP-46816-DA
05-Apr-18
06 APR 18/SCF
dt05-Apr-18
ITCWIND
ITCWIND
-ITCLS
06-Apr-18 06-Apr-18 0000-2400: 1 MW SR-WR-NR
310Apr-18/AP-46793-SD
04-Apr-18
MPL/18-19/STOA/06
dt04-Apr-18
Manikaran
KPCPL
-UPCL
05-Apr-18 05-Apr-18 0000-0100: 9.35 MW
0100-0200: 8.89 MW
0200-0300: 8.42 MW
0300-0400: 7.95 MW
0400-0500: 7.48 MW
0500-0700: 7.02 MW
0700-0900: 6.55 MW
0900-1100: 6.08 MW
1100-1200: 5.61 MW
1200-1300: 6.08 MW
1300-1400: 6.55 MW
1400-1500: 7.48 MW
1500-1600: 8.42 MW
1600-1700: 9.35 MW
1700-1800: 12.16 MW
1800-2000: 13.09 MW
2000-2200: 12.16 MW
2200-2400: 11.22 MW
----
311Apr-18/AP-46792-DA
04-Apr-18
04-BYPL/April-18(DA)
dt04-Apr-18
HPSEB
BYPL
-HPSEB
05-Apr-18 05-Apr-18 0200-0500: 50 MW ----
312Apr-18/AP-46788-SD
04-Apr-18
NPCL/MPPL/C040418
dt04-Apr-18
NPCL(UP)
MSPIL
-NPCL(UP)
04-Apr-18 04-Apr-18 1530-2400: 3 MW WR-NR
313Apr-18/AP-46795-DA
04-Apr-18
05 APR 18/SCF
dt04-Apr-18
ITCWIND
ITCWIND
-ITCLS
05-Apr-18 05-Apr-18 0000-2400: 1 MW SR-WR-NR
314Apr-18/AP-46786-FS
04-Apr-18
APPCPL/143/2941
dt03-Apr-18
APPCPL
HPSEB
-NPCL(UP)
16-Apr-18 30-Apr-18 0000-2400: 25 MW ----
315Apr-18/AP-46787-SD
04-Apr-18
BYPL/MP/Apr-18/2
dt04-Apr-18
BYPL
MPPMCL
-BYPL
04-Apr-18 04-Apr-18 1430-1830: 30 MW
1830-1930: 10 MW
1930-2400: 30 MW
WR-NR
316Apr-18/AP-46791-DA
04-Apr-18
MPPL/925/B/12685
dt04-Apr-18
MITTAL
HPPC
-HPSEB
05-Apr-18 05-Apr-18 0700-1800: 200 MW ----
317Apr-18/AP-46794-DA
04-Apr-18
MPPL/12665
dt04-Apr-18
MITTAL
Mizoram
-SIPL
05-Apr-18 05-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
318Apr-18/AP-46790-DA
04-Apr-18
SHEPL/APR/05
dt04-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
05-Apr-18 05-Apr-18 0000-0200: 1.9 MW
0200-0400: 1.85 MW
0400-0900: 1.6 MW
0900-1300: 1.5 MW
1300-1700: 1.9 MW
1700-1900: 2 MW
1900-2400: 2.3 MW
----
319Apr-18/AP-46789-DA
04-Apr-18
NHPPL/APR/05
dt04-Apr-18
NHPPL
NHPPL
-TPDDL
05-Apr-18 05-Apr-18 0000-0400: 3.25 MW
0400-1000: 3.1 MW
1000-1600: 2.95 MW
1600-2400: 3.5 MW
----
320Apr-18/AP-46768-SD
03-Apr-18
MPL/18-19/STOA/05
dt03-Apr-18
Manikaran
KPCPL
-UPCL
04-Apr-18 04-Apr-18 0000-0100: 9.35 MW
0100-0200: 8.42 MW
0200-0300: 7.95 MW
0300-0400: 7.48 MW
0400-0500: 7.02 MW
0500-0600: 6.55 MW
0600-0800: 6.08 MW
0800-1300: 5.61 MW
1300-1400: 6.08 MW
1400-1500: 6.55 MW
1500-1600: 7.02 MW
1600-1700: 7.48 MW
1700-1800: 9.35 MW
1800-2000: 10.29 MW
2000-2200: 9.35 MW
2200-2400: 8.42 MW
----
321Apr-18/AP-46767-SD
03-Apr-18
APPCPL/156/3121
dt03-Apr-18
APPCPL
TPDDL
-HPSEB
04-Apr-18 04-Apr-18 0000-0200: 100 MW
0200-0800: 200 MW
0800-2400: 100 MW
----
322Apr-18/AP-46770-DA
03-Apr-18
04 APR 18/SCF
dt03-Apr-18
ITCWIND
ITCWIND
-ITCLS
04-Apr-18 04-Apr-18 0000-2400: 1 MW SR-WR-NR
323Apr-18/AP-46766-DA
03-Apr-18
MPPL/925/B/12668
dt03-Apr-18
MITTAL
HPPC
-HPSEB
04-Apr-18 04-Apr-18 0800-1700: 200 MW ----
324Apr-18/AP-46769-DA
03-Apr-18
MPPL/12664
dt03-Apr-18
MITTAL
Mizoram
-SIPL
04-Apr-18 04-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
325Apr-18/AP-46765-DA
03-Apr-18
SHEPL/APR/04
dt03-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
04-Apr-18 04-Apr-18 0000-0200: 1.88 MW
0200-0400: 1.8 MW
0400-0900: 1.56 MW
0900-1300: 1.48 MW
1300-1700: 1.88 MW
1700-1900: 1.95 MW
1900-2400: 2.27 MW
----
326Apr-18/AP-46764-DA
03-Apr-18
NHPPL/APR/04
dt03-Apr-18
NHPPL
NHPPL
-TPDDL
04-Apr-18 04-Apr-18 0000-0400: 3.5 MW
0400-1000: 3.25 MW
1000-1600: 3.1 MW
1600-2400: 3.75 MW
----
327Apr-18/AP-46761-SD
02-Apr-18
MPL/18-19/STOA/04
dt02-Apr-18
Manikaran
KPCPL
-UPCL
03-Apr-18 03-Apr-18 0000-0200: 11.22 MW
0200-0400: 10.29 MW
0400-0600: 9.35 MW
0600-0700: 8.42 MW
0700-0900: 7.48 MW
0900-1200: 6.55 MW
1200-1400: 7.48 MW
1400-1500: 8.42 MW
1500-1600: 10.29 MW
1600-1700: 13.09 MW
1700-1800: 15.9 MW
1800-2000: 18.71 MW
2000-2100: 16.84 MW
2100-2200: 15.9 MW
2200-2300: 14.97 MW
2300-2400: 13.09 MW
----
328Apr-18/AP-46760-SD
02-Apr-18
03-BYPL/April-18(DA)
dt02-Apr-18
HPSEB
BYPL
-HPSEB
03-Apr-18 03-Apr-18 0000-0500: 90 MW
0500-2400: 60 MW
----
329Apr-18/AP-46763-DA
02-Apr-18
03 APR 18/SCF
dt02-Apr-18
ITCWIND
ITCWIND
-ITCLS
03-Apr-18 03-Apr-18 0000-2400: 1 MW SR-WR-NR
330Apr-18/AP-46756-FS
02-Apr-18

Rev.No: 2
GBHPL/UPCL/04-300418
dt31-Mar-18
BUDHIL
BUDHIL
-UPCL
04-Apr-18 15-Apr-18 0600-1000: 59.6 MW ----
16-Apr-18 20-Apr-18 0600-0830: 59.6 MW ----
21-Apr-18 30-Apr-18 0600-0830: 59.6 MW ----
331Apr-18/AP-46759-DA
02-Apr-18
MPPL/925/B/12663
dt02-Apr-18
MITTAL
HPPC
-HPSEB
03-Apr-18 03-Apr-18 0000-0100: 100 MW
0100-0400: 250 MW
0400-0500: 100 MW
0600-0800: 100 MW
0800-1800: 350 MW
2300-2400: 100 MW
----
332Apr-18/AP-46758-DA
02-Apr-18
SHEPL/APR/03
dt02-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
03-Apr-18 03-Apr-18 0000-0200: 1.72 MW
0200-0400: 1.64 MW
0400-0900: 1.41 MW
0900-1300: 1.33 MW
1300-1700: 1.72 MW
1700-1900: 1.8 MW
1900-2400: 2.11 MW
----
333Apr-18/AP-46754-FS
02-Apr-18
MPPL/916/12622
dt29-Mar-18
MITTAL
HPSEB
-NPCL(UP)
16-Apr-18 30-Apr-18 0000-2400: 15.75 MW ----
334Apr-18/AP-46755-SD
02-Apr-18
MPL/18-19/STOA/03
dt02-Apr-18
Manikaran
KPCPL
-UPCL
02-Apr-18 02-Apr-18 1230-1400: 5.8 MW
1400-1500: 6.17 MW
1500-1600: 6.27 MW
1600-1800: 6.36 MW
1800-1900: 4.68 MW
1900-2000: 4.77 MW
2000-2100: 4.02 MW
2100-2200: 4.12 MW
2200-2300: 3.83 MW
2300-2400: 3.27 MW
----
335Apr-18/AP-46762-DA
02-Apr-18
MPPL/12634
dt02-Apr-18
MITTAL
Mizoram
-SIPL
03-Apr-18 03-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
336Apr-18/AP-46757-DA
02-Apr-18
NHPPL/APR/03
dt02-Apr-18
NHPPL
NHPPL
-TPDDL
03-Apr-18 03-Apr-18 0000-0300: 2.92 MW
0300-0600: 2.69 MW
0600-1200: 2.46 MW
1200-1500: 2.31 MW
1500-1700: 2.69 MW
1700-2400: 3 MW
----
337Apr-18/AP-46751-DA
01-Apr-18
NHPPL/APR/02
dt01-Apr-18
NHPPL
NHPPL
-TPDDL
02-Apr-18 02-Apr-18 0000-0300: 2.31 MW
0300-0600: 2.15 MW
0600-1200: 2 MW
1200-1500: 1.92 MW
1500-1700: 2.08 MW
1700-2400: 2.46 MW
----
338Apr-18/AP-46750-DA
01-Apr-18
SHEPL/APR/02
dt01-Apr-18
SHEPL_HP
SHEPL_HP
-TPDDL
02-Apr-18 02-Apr-18 0000-0800: 1.33 MW
0800-1400: 1.17 MW
1400-1700: 1.25 MW
1700-1900: 1.72 MW
1900-2400: 1.88 MW
----
339Apr-18/AP-46749-DA
01-Apr-18
APPCPL/156/3111
dt01-Apr-18
APPCPL
TPDDL
-HPSEB
02-Apr-18 02-Apr-18 0000-2400: 100 MW ----
340Apr-18/AP-46748-DA
01-Apr-18
02-BYPL/April-18(DA)
dt01-Apr-18
HPSEB
BYPL
-HPSEB
02-Apr-18 02-Apr-18 0000-0500: 75 MW
0500-2400: 50 MW
----
341Apr-18/AP-46753-DA
01-Apr-18
02 Apr 18/SCF
dt01-Apr-18
ITCWIND
ITCWIND
-ITCLS
02-Apr-18 02-Apr-18 0000-2400: 1 MW SR-WR-NR
342Apr-18/AP-46747-DA
01-Apr-18
MPL/18-19/STOA/02
dt01-Apr-18
Manikaran
KPCPL
-UPCL
02-Apr-18 02-Apr-18 0000-0100: 7.48 MW
0100-0200: 7.02 MW
0200-0400: 6.55 MW
0400-0600: 6.08 MW
0600-0700: 5.61 MW
0700-1000: 5.14 MW
1000-1500: 4.68 MW
1500-1600: 5.61 MW
1600-1700: 7.48 MW
1700-1800: 8.42 MW
1800-2100: 10.29 MW
2100-2200: 9.35 MW
2200-2300: 8.89 MW
2300-2400: 8.42 MW
----
343Apr-18/AP-46752-DA
01-Apr-18
MPPL/12633
dt01-Apr-18
MITTAL
Mizoram
-SIPL
02-Apr-18 02-Apr-18 0000-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
344Apr-18/AP-46746-DA
01-Apr-18
MPPL/925/B/12660
dt01-Apr-18
MITTAL
HPPC
-HPSEB
02-Apr-18 02-Apr-18 0000-0600: 150 MW
0800-1800: 300 MW
2200-2400: 250 MW
----
345Mar-18/AP-46743-SD
31-Mar-18
MPL/18-19/STOA/01
dt31-Mar-18
Manikaran
KPCPL
-UPCL
01-Apr-18 01-Apr-18 0000-1200: 4.68 MW
1400-2400: 4.68 MW
----
346Mar-18/AP-46742-DA
31-Mar-18
NHPPL/APR/01
dt31-Mar-18
NHPPL
NHPPL
-TPDDL
01-Apr-18 01-Apr-18 0000-0300: 2.08 MW
0300-1200: 1.77 MW
1200-1500: 1.69 MW
1500-1700: 1.85 MW
1700-2400: 2.23 MW
----
347Mar-18/AP-46741-DA
31-Mar-18
01-BYPL/April-18(DA)
dt31-Mar-18
HPSEB
BYPL
-HPSEB
01-Apr-18 01-Apr-18 0000-2400: 50 MW ----
348Mar-18/AP-46740-DA
31-Mar-18
PTC/OA/28112
dt31-Mar-18
PTC
SCLTPS
-NEPAL
01-Apr-18 01-Apr-18   ----
349Mar-18/AP-46745-DA
31-Mar-18
01 Apr 18/SCF
dt31-Mar-18
ITCWIND
ITCWIND
-ITCLS
01-Apr-18 01-Apr-18 0000-2400: 1 MW SR-WR-NR
350Mar-18/AP-46739-DA
31-Mar-18
MPPL/925/B/12659
dt31-Mar-18
MITTAL
HPPC
-HPSEB
01-Apr-18 01-Apr-18 0000-0500: 300 MW
0600-0730: 100 MW
0730-1800: 350 MW
2100-2400: 250 MW
----
351Mar-18/AP-46738-DA
31-Mar-18
SHEPL/APR/01
dt31-Mar-18
SHEPL_HP
SHEPL_HP
-TPDDL
01-Apr-18 01-Apr-18 0000-0300: 1.17 MW
0300-1400: 1.25 MW
1400-1700: 1.33 MW
1700-2400: 1.49 MW
----
352Mar-18/AP-46744-DA
31-Mar-18
MPPL/12632
dt31-Mar-18
MITTAL
Mizoram
-SIPL
01-Apr-18 01-Apr-18 0000-0215: .8 MW
0215-0230: 0 MW
0230-1000: .8 MW
1000-2200: 3.5 MW
2200-2400: .8 MW
NER-ER-NR
353Mar-18/AP-46710-FS
29-Mar-18
PTC/OA/28083
dt29-Mar-18
PTC
SCLTPS
-NEPAL
02-Apr-18 07-Apr-18 0000-2400: 10 MW ----
354Mar-18/AP-46704-FS
29-Mar-18
APPCPL/108/3101/16
dt28-Mar-18
APPCPL
Sikkim
-JDPL
01-Apr-18 15-Apr-18 0000-0800: .4 MW
0800-1800: .5 MW
2300-2400: .5 MW
ER-NR
355Mar-18/AP-46668-FS
27-Mar-18

Rev.No: 2
APPCPL/151/3068/R
dt26-Mar-18
APPCPL
JITPL
-NPCL(UP)
02-Apr-18 07-Apr-18 1100-1500: 35 MW
1500-1900: 0 MW
1900-2400: 35 MW
ER-NR
09-Apr-18 09-Apr-18 1100-1500: 35 MW
1500-1900: 0 MW
1900-2400: 35 MW
ER-NR
10-Apr-18 10-Apr-18 1100-1500: 20 MW
1500-1900: 0 MW
1900-2400: 20 MW
ER-NR
11-Apr-18 14-Apr-18 1100-1500: 35 MW
1500-1900: 0 MW
1900-2400: 35 MW
ER-NR
16-Apr-18 21-Apr-18 1100-1500: 35 MW
1500-1900: 0 MW
1900-2200: 5 MW
2200-2300: 0 MW
2300-2400: 35 MW
ER-NR
23-Apr-18 26-Apr-18 1100-1500: 35 MW
1500-1900: 0 MW
1900-2200: 5 MW
2200-2300: 0 MW
2300-2400: 35 MW
ER-NR
27-Apr-18 28-Apr-18 1100-1500: 25 MW ER-NR
30-Apr-18 30-Apr-18 1100-1500: 25 MW ER-NR
356Mar-18/AP-46653-AD
26-Mar-18
APPCPL/36/3006
dt21-Mar-18
APPCPL
APPCC
-NPCL(UP)
01-Apr-18 14-Apr-18 0000-2400: 15 MW SR-ER-NR
15-Apr-18 15-Apr-18 0000-2200: 15 MW
2200-2300: 5 MW
2300-2400: 15 MW
SR-ER-NR
357Mar-18/AP-46652-AD
26-Mar-18
BYPL/MP/Apr-18/1
dt21-Mar-18
BYPL
MPPMCL
-BYPL
15-Apr-18 30-Apr-18 0000-0200: 50 MW
1400-1800: 50 MW
2200-2400: 50 MW
WR-NR
358Mar-18/AP-46651-AD
26-Mar-18
BRPL/MP/0418
dt15-Mar-18
BRPL
MPPMCL
-BRPL
16-Apr-18 30-Apr-18 0000-2200: 50 MW
2200-2300: 5 MW
2300-2400: 50 MW
WR-NR
359Mar-18/AP-46610-AD
23-Mar-18
PTC/OA/28040
dt21-Mar-18
PTC
J & K
-PSPCL
01-Apr-18 30-Apr-18 0000-2400: 150 MW ----
360Mar-18/AP-46609-AD
23-Mar-18
PTC/OA/28020
dt13-Mar-18
PTC
Dikchu
-NDMC
01-Apr-18 30-Apr-18 0800-1800: 40.06 MW ER-NR
361Mar-18/AP-46608-AD
23-Mar-18

Rev.No: 2
APPCPL/103/2873
dt08-Mar-18
APPCPL
HPPC
-NPCL(UP)
01-Apr-18 15-Apr-18 0000-2400: 50 MW ----
16-Apr-18 19-Apr-18 0500-1900: 5 MW ----
362Feb-18/AP-46139-AD
02-Feb-18

Rev.No: 1
PTC/OA/27971
dt31-Jan-18
PTC
JNSTPP
-UPPCL
01-Apr-18 23-Apr-18 0000-0500: 200 MW WR-ER-NR
24-Apr-18 30-Apr-18 0000-0500: 100 MW WR-ER-NR
363Feb-18/AP-46138-AD
02-Feb-18
PTC/OA/27972
dt31-Jan-18
PTC
TPDDL
-UPPCL
01-Apr-18 30-Apr-18 0000-0500: 100 MW ----
364Feb-18/AP-46137-AD
02-Feb-18

Rev.No: 1
4437/OAN/GMRETL/APNR
dt30-Jan-18
GMRETL
APNRL
-UPPCL
01-Apr-18 01-Apr-18 0000-0500: 50 MW ER-NR
06-Apr-18 27-Apr-18 0000-0500: 28.92 MW ER-NR
28-Apr-18 30-Apr-18 0000-0500: 50 MW ER-NR
365Feb-18/AP-46136-AD
02-Feb-18
1000004151-PSPCL-UPP
dt25-Jan-18
TATA
PSPCL
-UPPCL
01-Apr-18 30-Apr-18 0000-0500: 200 MW ----
366Feb-18/AP-46135-AD
02-Feb-18
PTC/OA/27966
dt29-Jan-18
PTC
J & K
-PSPCL
01-Apr-18 30-Apr-18 0000-2400: 100 MW ----
367Feb-18/AP-46134-AD
02-Feb-18
MPPL/891/B/12397
dt25-Jan-18
MITTAL
CESC
-UPPCL
01-Apr-18 15-Apr-18 0200-0300: 50 MW
0300-0500: 100 MW
ER-NR
368Feb-18/AP-46133-AD
02-Feb-18

Rev.No: 1
MPL/17-18/STOA/584
dt24-Jan-18
Manikaran
MBPOWER
-UPPCL
01-Apr-18 22-Apr-18 0000-0500: 100 MW WR-ER-NR
23-Apr-18 24-Apr-18 0000-0500: 99 MW WR-ER-NR
29-Apr-18 30-Apr-18 0000-0500: 100 MW WR-ER-NR