POSOCO_Final_Logo

Northern Regional Load Despatch Centre

POWER SYSTEM OPERATION CORPORATION LIMITED

(A Government of India Enterprise) CIN: U40105DL2009GOI188682

NRLDC GSTIN : 07AAFCP2086B1ZO

ISO-9001-2008ISO-14001-2004ISO-IEC-27001-2013OHSAS-18001-2007PAS-99-2012
Login | Intranet | Mail
  • Home
  • Transfer capability
    • Monthly ATC-Inter Country
    • Monthly ATC-Inter Regional
    • Monthly ATC-Intra Regional
    • Current IR Exchanges
      • Declared Capability
  • Scheduling
    • New WBES
      • New Web Based Scheduling
      • Scheduling Summary
      • Scheduling Details
      • Old Schedule
        • Declared Capability
        • Entitlements
        • State Drawal Schedules
        • ISGS Injection Schedules
        • Injection Profile
        • URS Details
          • Total Available URS
            • Station
            • State
          • URS Sold Under STOA
          • Current Available URS
            • Thermal Station
            • Gas Stations
          • Re-Scheduled URS
            • Station Wise
            • State Wise
        • Transmission Constraints
          • State Wise
          • Station Wise
        • IR Drawal Schedules
        • Implemented Schedules
          • Form-A
          • Form-B
          • Form-C
          • IR Drawal
          • URS
        • Summary
          • State Wise
          • Station Wise
        • Applicable Losses
    • Applicable PoC Losses
    • Estimated Tx Loss
    • Peak Hours Declaration
    • Solar Forecast
      • Solar Forecast Data
      • Solar Forecast Graph
    • Regional Wind Forecast
  • Open Access
    • New Web Based STOA
    • View Bilateral Transactions
      • Prior to Aug-2018
      • Aug-2018 onwards
    • View Refused Applications
      • Prior to Aug-2018
      • Aug 2018 onwards
    • Inter – Regional Links Usage
    • Transmission Losses for Last 52 Weeks In NR
    • STU/SLDC Report
    • Applicant Refund Report
    • CERC’s Orders
    • Open Access Related Document
    • Refund Reconciliation Sheet
    • STU/SLDC Reconciliation Sheet
  • Renewables
    • RE Framework Procedures
    • Formats for Registrations
  • Commercial
    • DSM Rates
    • NR Pool Account
      • Reconciliation of Pool Accounts
      • Deviation/RE/Congestion Disb Letters
    • SEM Data
    • Guidelines for Computation
    • Time Correction Procedure Video
    • Time Correction Procedure
    • NRLDC Fee and Charges
      • NRLDC F& C Billing/Payment Software
      • NRLDC Fee and Charges Order
      • NRLDC User Details
      • Bank Detail For Remmitting NRLDC Fee and Charges
      • Bill Details
      • F and C Reconciliation
      • Truing-up Details
    • Violation Report
      • Zero Crossing Violation Report
      • Deviation Report
    • Discrepancy report
    • Metering Regulations
  • Availability Verification
  • Reports
    • Daily Reports
      • Daily Regional Power Supply Position
      • Transmission Elements Outage Status
      • Generating Units Outage Status
      • Outage Report New (25/09/2019 onwards)
      • Fog Report
    • Weekly Reports
    • Quarterly Reports
    • Monthly Reports
    • Annual Reports
    • VDI
      • Daily
        • VDI 765kV
        • VDI 400kV
      • VDI Weekly
        • VDI 765KV(Weekly)
        • VDI 400KV(Weekly)
      • Monthly
        • VDI 765KV(Monthly)
        • VDI 400KV(Monthly)
    • Trend Graphs
      • Frequency Profile in NR
      • Shdl vs Act drawal of states in NR
    • RTU Availability
    • Telemetry Report
    • SCADA-SEM Comparision Report
    • System Reliability Indices(All India)
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Differences
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliabilty
    • Grid Disturbances / Incidences
    • FRC
    • Tripping Report
      • Preliminary Report
    • New Web Based Reporting
    • Tripping Monitoring System
  • Documents
  • Real-Time Data
    • RE Initiative
  • Weather
    • NR Weather Info
    • Thunderstorm Live Status
  • Other RLDCs
    • NLDC
    • ERLDC
    • SRLDC
    • WRLDC
    • NERLDC
  • Outage
    • Shutdown Planning

Estimated Tx Loss

  • Linkedin
  • Twitter
  • About Us
  • Awards
  • Tenders
  • RTI
  • Site Map
  • Contact Us
  • Feedback
  • Disaster Management
  • Internship-Guide Lines
  • Useful Links
NRLDC, POWER SYSTEM OPERATION CORPORATION LIMITED,
18-A, Shaheed Jeet Singh Sansalwal Marg, Katwaria Sarai, New Delhi -110016 © Copyright ©2017 NRLDC
  • English
  • हिन्दी
All Visitors:  

WordPress Download Manager - Best Download Management Plugin

Disclaimer

Precautions have been taken by Northern RegionalLoad Dispatch Center (NRLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NRLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NRLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NRLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NRLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NRLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.